Laserfiche WebLink
Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer - Exhibit A Scope of Work <br /> <br />37 <br /> <br />Deliverables: <br />• Discipline items to include in Corrective Work Items Lists – all disciplines. <br />• Construction Completion Report (electronic deliverable transferred through OneDrive). <br />Task 1055.2 Record Documents <br />BC will produce record drawings using vendor submittal and as-built information provided by the <br />Contractor. <br />Activities/Approach: <br />• Final record drawings will start from markups in Bluebeam session and will incorporate <br />redlines provided by the Contractor and limited field confirmation of record conditions <br />(assumed 40 hours of field review time and 80 hours of office engineering support). The <br />Contractor will maintain responsibility for the accuracy of redlines in conveying the as-built <br />conditions. <br />• For budgeting purposes, 60 sheets are assumed to require revisions for the final record set <br />and each sheet is assumed to require 8 hours of CAD effort for revisions (480 hours). Effort <br />includes updating the title block for all sheets. <br />• Record drawings will not be signed or sealed. <br />Assumptions: <br />• Demolition Drawings (those noted as #X in drawing designation, i.e., CX-2021, EX-2001) will <br />not be included with record drawing set. <br />• Temporary facilities drawings (i.e., temporary erosion and sediment control) will not be <br />included with record drawing set. <br />• Contractor will provide 2D redlined as-built drawings, which include complete and <br />comprehensive redlines for the entire contract drawing set. Although the Contractor will be <br />required to provide a BIM coordination model at the end of construction, as-built information <br />therein will not substitute for the 2D redlines. <br />• BC will follow City of Everett CAD Standards. <br />Deliverables: <br />• Final record drawings, in electronic format <br /> <br />Phase 1056 – Package 2 Unanticipated Services (scope and budget augmented to original <br />Agreement) <br />Objective: Provide budget allowance for potential additional work requested by the City. <br />Activities/Approach: To be determined, based on City requests. No work will be completed under this <br />phase without written direction from the City. The budgeted amount for unanticipated services is as <br />provided in Exhibit B. <br />Phase Assumptions: <br />• BC will prepare a Project Change Request (PCR) describing each additional and identifiable <br />task under this allowance. The PCR will include a short description of the added scope with <br />budget to be authorized prior to proceeding, unless otherwise directed in writing by the City. <br />• The City will provide direction and authorization for requested additional work.