My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 3:27:37 PM
Creation date
4/13/2026 3:26:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
4/11/2026
Council Approval Date
4/8/2026
End Date
12/31/2028
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF WMVD Storm and Combined Sewer
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003935
Total Compensation
$3,783,388.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell, Inc. 9/20/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Staff Member Role 2026 Hourly Rate** <br />Abbi Dorn S/W pre-treatment oversight 347$ <br />Alexander Mockos Project Manager 386$ <br />Benjamin Leach Lead Designer 264$ <br />Brigid O'Neill Civil Engineer 122$ <br />Carolyn Roth Princial Engineer 242$ <br />Catherine Dummer Cost Estimating 251$ <br />Chad Warren Principal Engineer 249$ <br />Drew Tucker Electrical Lead 331$ <br />Elliot Mecham Geotech Specialist 317$ <br />Gino Mazzotti Structural Engineer 206$ <br />Jennifer Fu Civil Engineer 182$ <br />Kirsten Weber Principal Engineer 247$ <br />Margaret Ales Modeling Oversight 238$ <br />Myesha Henderson Delivery Coordinator 161$ <br />Nathalie Costaz Project Analyst 170$ <br />Pavel Venc Construction Engineer 260$ <br />Robert Davis Civil SME 243$ <br />Susan Nguyen Accounts 90$ <br />Thomas Pennington Geotech SME 410$ <br />Travis Franklin Civil Lead 182$ <br />Exhibit B-1: Everett PGSF WMVD A C E Package Project Staff, Roles, and Rates* <br />* Rates are subject to changes on an annual basis and/or at the time of individual direct <br />labor rate changes. <br />** Rates will be escalated 5% annually on 01/01
The URL can be used to link to this page
Your browser does not support the video tag.