My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026/04/15 Council Agenda Packet
>
Council Agenda Packets
>
2026
>
2026/04/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 10:20:05 AM
Creation date
4/16/2026 10:14:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Public Works Board Pre-Construction Loans applications for funds up to $5,000,000. <br /> <br />Council Bill # <br /> <br />Project: WPCF Headworks Design Phase <br />Partner/Supplier: Public Works Board <br /> Location: Everett Water Pollution Control Facility (WPCF) <br />Preceding action: None <br />Fund: N/A <br />Agenda dates requested: <br /> <br /> <br />Briefing <br />Proposed action <br />Consent 4/15/26 <br />Action <br />Ordinance <br />Public hearing <br /> Yes x No <br /> <br />Budget amendment: <br /> Yes x No <br /> <br />PowerPoint presentation: <br /> Yes x No <br /> <br />Attachments: <br />PWB Applicant Certification <br /> <br />Department(s) involved: <br />Public Works, Administration <br /> <br />Contact person: <br />Shaun Bridge <br /> <br />Phone number: <br />425-257-8823 <br /> <br />Email: <br />sbridge@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The City of Everett has an opportunity to apply for Public Works Board Pre-Construction <br />Loans, which offer 1.06% standard interest rates, and a reduced rate of .85% if the City <br />meets certain eligibility criteria. <br />If authorized and awarded, the loan would fund the majority of the design costs for the <br />WPCF Headworks. <br /> <br />Project summary statement: <br />The Everett Water Pollution Control Facility (WPCF) is located on Smith Island in north <br />Everett. Treating 7 billion gallons of wastewater every year, it serves the city of Everett, <br />and parts of Alderwood Water and Wastewater District, Mukilteo Water and <br />Wastewater District and Silver Lake Water and Sewer District. <br />The headworks structure was constructed in 1983-84 and has been upgraded and <br />repaired many times since. <br />The headworks structure needs complete replacement due to ongoing and increasing <br />internal structural degradation and process equipment deterioration. Risks of <br />replacement delay include City personnel injury, catastrophic process equipment failure <br />and costly short-term repairs. <br />This project will replace the existing headworks structure in two phases: engineering <br />assessment, and design and construction. <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor or her designee to apply for, and if awarded, to sign all necessary <br />documents and agreements for Public Works Board Pre-Construction Loans up to <br />$5,000,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.