Laserfiche WebLink
PUBLIC WORKS UTILITY Date Applied: 12/21/2018 <br /> Permit#: PW1812-052 <br /> PERMIT Parent Permit#: <br /> Permit Type: PUBLIC WORKS UTILITY <br /> City of Everett Permit Services Permit Subt e: OTHER ROW WORK <br /> 3200 Cedar Street, 2"d Floor yp <br /> Everett, WA 98201 Permit Fee: $3515.00 <br /> (425)257-8810 <br /> UTILITY COMPANY NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MCI Metro Access Transmission Services, Corp Arnaldo Blanco <br /> 3245 158th Ave SE, 3rd Floor 3000, E Cesar Chavez St. <br /> Bellevue, WA, 98008 Austin, TX, 78702 <br /> PHONE: 4282293123 PHONE: 7873492960 <br /> TAX PARCEL ID#: 28040200301300 SITE ADDRESS: 6500 MERRILL CREEK PKWY <br /> DESCRIPTION: MCI Metro Franchise Permit# 1801AVAO.3 ROW EVT 0639 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance (by 4pm one business day prior to the requested inspection). <br /> 2. All work shall be performed in accordance with the permit and current City of Everett `Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Traffic Control must be done in accordance with MUTCD Standards and the Traffic Control Plan approved by City of <br /> Everett dated 01/08/2019. <br /> 5. Any damage to City improvements (sidewalk, curb, roadway, etc.)shall be replaced per City Standards and/or as <br /> directed by the City PW Inspector. <br /> 6. Street restoration must be done per COE Standard Drawing#326 and trench restoration per#614, or as directed by the <br /> City PW Inspector. Permanent restoration must be completed within 2 weeks of completion of utility work. <br /> 7. Full lane width grind and overlay is required for trenches greater than 100' in length, multiple cuts within a 100' length <br /> section, and/or as directed by the City PW Inspector. <br /> 8. A minimum of 5ft separation between City of Everett utilities and directional boring/pavement cuts shall be maintained. <br /> 9. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 prior to starting construction, potholing <br /> all City utilities, to evaluate traffic control set-up, with other inspection requests, and to final the permit. <br /> 10. Potholing required for all crossings over/under City of Everett water mains. <br /> 11. Coordinate with adjoining businesses/homeowners to minimize obstruction of commerce/access. <br /> 12. Noise from temporary construction sites is not allowed 10:OOPM —7:OOAM weekdays, 6:OOPM —8:OOAM weekends <br /> unless a variance has been issued. Construction projects wishing a variance from the noise ordinance must submit an <br /> application at least 30 days prior to commencing work. Please visit the following website for more information: <br /> https://everettwa.gov/1547/Temporary-Noise-Variance-Requests. <br /> Public Works Permit Fee Breakdown: <br /> Cut/Bore Alley/Pavement (Parallel) (2521 LF)..............$2521.00 <br /> Cut/Bore Alley/Pavement (Non-Parallel) (318 LF)...........$954.00 <br /> PW Plan Review..............................................................$20.00 <br /> PW Site Inspection..........................................................$20.00 <br /> City of EverettOffcial Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the <br /> owner/applicant hereby agrees to hold and save harmless <br /> the City of Everett from any and all claims for damages, <br /> costs,expenses,or causes of action that may arise <br /> n <br /> /"d lkaoo r 01/09/2019 because of installation and maintenance of the <br /> improvement or other right-of-way use here to applied for <br /> and further agrees to remove same upon notice from the <br /> Approved for Construction, Public Works Dept. Date City and to replace public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />