My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Everon LLC 4/17/2026 Change Order 2
>
Contracts
>
6 Years Then Destroy
>
2026
>
Everon LLC 4/17/2026 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2026 3:56:24 PM
Creation date
4/17/2026 3:55:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Everon LLC
Approval Date
4/17/2026
End Date
5/1/2026
Department
Finance
Department Project Manager
Bert Cueva
Subject / Project Title
Everett Municipal Court – Judges Exit Door
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0004999
Total Compensation
$4,941.10
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />********************************************************************************* <br /> <br />Change Order 1 for Locking Hardware Changes <br /> <br />Below is a list of discussed changes based on site walk 12/16/2025 <br /> <br />•Upgrade of LifeSafety power supply to support 16 doors of mercury equipment. <br />•Removal of Honeywell controller and two expansion boards. <br />•Addition of mercury PWLP1502 and two PWMR52-S3B control boards. <br />•Removal of three subcontractor supplied and installed electric strikes. <br />•Addition of three Everon supplied and installed magnetic locks. (Please note customer is responsible for AHJ approval) <br />•Removal of 32 reader add on license. <br /> <br />************************************************************************* <br />Everon will provide: <br />•Design Engineering <br />•Equipment, Freight, and Installation (see below Everon provided equipment) <br />•Programming, Testing and Commissioning <br />•Project Close-out <br />•Equipment Warranty (Everon provided equipment) <br />•Work to be performed <br />•7AM – 4:30PM Monday – Friday <br />In the Equipment Schedule below, we have noted the locations in your facility where work will be done and equipment will be installed. <br /> <br />*Revit RVT format also available. Additional costs for labor and coordination will apply. <br />**Everon requires AutoCAD ‘DWG’ background files to produce the Security Design Drawing Package. We are able to convert other file <br />formats including Adobe ‘PDF’ files, but understand that the conversion of such files may take additional time and expense. <br />Everon To Provide: Provide and Install (3) Access Controlled doors. Subcontractor to Provide locks, change existing Crash Bars (REX and <br />contacts) Readers on both sides of doors. Crash bars have 30 second delay, Access Control will <br />allow 30 second delay exception for Judges. Run Composite wire to Head-end location, (1) power supply to power locks, connection to fire <br />system to drop locks on fire is 30 ft. away from head-end. <br />PRICING: If Everon’s cost of products sold under this agreement is increased by: (a) any government action, executive order, tariff, duty, tax, or <br />other government-imposed fee; (b) foreign currency exchange variation; and/or (c) other increased cost of third-party supplies, labor, and/or <br />Products, then <br />Everon shall have the right to increase pricing in the amount equal to the increased cost of products. If applicable, Everon shall have an <br />immediate right to a change order for any such cost and price increase. The timing and effectiveness of any such price increase is separate <br />from and in addition to <br />any changes to pricing that are affected by any other provisions in this Agreement <br /> <br /> <br />Client to provide: <br /> <br />•Access to work areas during normal business hours <br />•Network connectivity, open network port, POE ports, IP schema <br />•120VAC connection to new power supply
The URL can be used to link to this page
Your browser does not support the video tag.