Laserfiche WebLink
Proposal Includes: <br />Fire alarm includes (1) permit ONLY additional/revised permitting requires a change order. <br />Fire alarm price is subject to change per sprinkler system. <br />Engineering, including project drawings, equipment submittals, as-built drawings and Operation & Maintenance manuals. <br />Installation of wiring, devices, specialty back-boxes and panels during normal business hours. <br />One-year warranty on all components, material and installation. <br />(Includes on-site training only; No Travel is included; Training provided by Everon Staff) <br />Standard Freight and Delivery. <br />Everon is not responsible for any items or details not shown that may affect the system concept or design. Any changes in design <br />concept, any additional devices required by State or Local Code, the Authority Having Jurisdiction or Fire Marshall will affect this <br />price accordingly. AutoCAD Background Drawings shall be provided at no additional cost to Everon. There is an extra charge for <br />after hours or weekend labor and any additional devices not shown. Additional devices and labor will be provided upon receipt of <br />an approved change order. <br />CUSTOMER agrees that at this time, the availability and price of certain Materials and Commodities (“Material”) worldwide, <br />including but not limited to, chip components, oil, gasoline, steel, aluminum and plastic products can be extremely volatile. <br />Everon guarantees the pricing in this proposal for no more than the next thirty (30) days from the date of this Proposal. Customer <br />further agrees that should the cost to Everon of the Materials required for this Project rise after the thirty (30) day period, Everon <br />reserves the right to reasonably reassess the cost differential and add any increase to the above pricing. <br />CUSTOMER agrees that at this time, the availability and price of certain Materials and Commodities (“Material”) worldwide, <br />including but not limited to, chip components, oil, gasoline, steel, aluminum and plastic products can be extremely volatile. <br />Everon guarantees the pricing in this proposal for no more than the next thirty (30) days from the date of this Proposal. Customer <br />further agrees that should the cost to Everon of the Materials required for this Project rise after the thirty (30) day period, Everon <br />reserves the right to reasonably reassess the cost differential and add any increase to the above pricing. <br />Design & Bid is based off plans listed in this proposal. Any changes made by the owner, GC, EC and/or the AHJ may result in <br />additional costs. <br />If Everon’s cost of products sold under this agreement is increased by: (a) any government action, executive <br />order, tariff, duty, tax, or other government-imposed fee; (b) foreign currency exchange variation; and/or (c) <br />other increased cost of third-party supplies, labor, and/or Products, then Everon shall have the right to increase <br />pricing accordingly. If applicable, Everon shall have an immediate right to a change order for any such cost and <br />price increase. The timing and effectiveness of any such price increase is separate from and in addition to any <br />changes to pricing that are affected by any other provisions in this Agreement.