My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Everon LLC 4/17/2026 Change Order 2
>
Contracts
>
6 Years Then Destroy
>
2026
>
Everon LLC 4/17/2026 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2026 3:56:24 PM
Creation date
4/17/2026 3:55:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Everon LLC
Approval Date
4/17/2026
End Date
5/1/2026
Department
Finance
Department Project Manager
Bert Cueva
Subject / Project Title
Everett Municipal Court – Judges Exit Door
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0004999
Total Compensation
$4,941.10
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Proposal Includes: <br />Fire alarm includes (1) permit ONLY additional/revised permitting requires a change order. <br />Fire alarm price is subject to change per sprinkler system. <br />Engineering, including project drawings, equipment submittals, as-built drawings and Operation & Maintenance manuals. <br />Installation of wiring, devices, specialty back-boxes and panels during normal business hours. <br />One-year warranty on all components, material and installation. <br />(Includes on-site training only; No Travel is included; Training provided by Everon Staff) <br />Standard Freight and Delivery. <br />Everon is not responsible for any items or details not shown that may affect the system concept or design. Any changes in design <br />concept, any additional devices required by State or Local Code, the Authority Having Jurisdiction or Fire Marshall will affect this <br />price accordingly. AutoCAD Background Drawings shall be provided at no additional cost to Everon. There is an extra charge for <br />after hours or weekend labor and any additional devices not shown. Additional devices and labor will be provided upon receipt of <br />an approved change order. <br />CUSTOMER agrees that at this time, the availability and price of certain Materials and Commodities (“Material”) worldwide, <br />including but not limited to, chip components, oil, gasoline, steel, aluminum and plastic products can be extremely volatile. <br />Everon guarantees the pricing in this proposal for no more than the next thirty (30) days from the date of this Proposal. Customer <br />further agrees that should the cost to Everon of the Materials required for this Project rise after the thirty (30) day period, Everon <br />reserves the right to reasonably reassess the cost differential and add any increase to the above pricing. <br />CUSTOMER agrees that at this time, the availability and price of certain Materials and Commodities (“Material”) worldwide, <br />including but not limited to, chip components, oil, gasoline, steel, aluminum and plastic products can be extremely volatile. <br />Everon guarantees the pricing in this proposal for no more than the next thirty (30) days from the date of this Proposal. Customer <br />further agrees that should the cost to Everon of the Materials required for this Project rise after the thirty (30) day period, Everon <br />reserves the right to reasonably reassess the cost differential and add any increase to the above pricing. <br />Design & Bid is based off plans listed in this proposal. Any changes made by the owner, GC, EC and/or the AHJ may result in <br />additional costs. <br />If Everon’s cost of products sold under this agreement is increased by: (a) any government action, executive <br />order, tariff, duty, tax, or other government-imposed fee; (b) foreign currency exchange variation; and/or (c) <br />other increased cost of third-party supplies, labor, and/or Products, then Everon shall have the right to increase <br />pricing accordingly. If applicable, Everon shall have an immediate right to a change order for any such cost and <br />price increase. The timing and effectiveness of any such price increase is separate from and in addition to any <br />changes to pricing that are affected by any other provisions in this Agreement.
The URL can be used to link to this page
Your browser does not support the video tag.