My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:32:36 PM
Creation date
4/21/2026 1:25:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 1
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 34 <br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 WO# UP-3815-02 <br /> <br /> <br />00 72 00 - 34 GENERAL CONDITIONS <br />2. No payment will be made for extended or unabsorbed home office Overhead and field Overhead <br />expenses to the extent that there is an unbalanced allocation of such expenses among the Contract <br />bid items. <br />3. No payment for consequential damages or loss of anticipated profits will be allowed because of <br />variance in quantities from those originally shown in the bid form, Contract provision, and <br />Drawings. <br />When ordered by the Owner’s Representative, the Contractor shall proceed with the Work pending <br />determination of the adjustment of Contract Sum or Contract Time for the variation in quantities. <br />The Owner will not adjust for increases or decreases if the Owner has entered the amount for the item in <br />the bid form only to provide a common Bid for Bidders. <br />9.2.2. Changes in Work Not Covered By Unit Prices <br />Contractor shall be paid for changes in Work not covered by unit prices as provided in 9.5. <br />ADJUSTMENT OF CONTRACT SUM. <br />9.2.3. Deleted Work <br />The Owner’s Representative may delete Work as provided in ARTICLE 6. CHANGES or may <br />terminate the Contract in whole or part as provided in 5.4.2. Termination for Convenience. When the <br />Contract is partially terminated for the Owner’s convenience, the partial termination shall be treated as a <br />deductive Change Order for payment purposes under this section. <br />Payment for completed items will be at Contract unit prices or pursuant to the Schedule of Values. <br />When a Change Order deletes an item in whole or in part, or when the Contract is terminated for <br />convenience in whole or in part, payment for deleted or terminated Work will be made as follows: <br />1. Payment will be made for the actual number of units of Work completed at the unit contract <br />prices unless the Owner’s Representative determines the unit prices are inappropriate for the <br />Work actually performed. When the Owner’s Representative determines the unit prices are <br />inappropriate for the Work actually performed, payment for Work performed will be as mutually <br />agreed. If the parties cannot agree, the Owner’s Representative will determine the amount of the <br />adjustment of Contract Sum in accordance with 9.5. ADJUSTMENT OF CONTRACT SUM; <br />2. Payment for partially completed lump sum items will be as mutually agreed. If the parties cannot <br />agree, the Owner’s Representative will determine the amount of the adjustment of Contract Sum <br />in accordance with 9.5. ADJUSTMENT OF CONTRACT SUM; <br />3. To the extent not paid for by the Contract Sum for the completed units of Work, the Owner will <br />pay as part of the adjustment of Contract Sum those direct costs necessarily and actually incurred <br />by the Contractor in reasonable anticipation of performing the Work that has been deleted or <br />terminated; <br />4. The total payment for any one item in the case of a deletion or partial termination shall not exceed <br />the Bid price as modified by approved Change Orders less the estimated cost, including Overhead <br />and profit, to complete the Work and less any amount paid to the Contractor for the item; <br />5. If the entire remainder of the Contract is terminated, the total payment to the Contractor shall not <br />exceed the total Contract Sum as modified by approved Change Orders less those amounts paid to <br />the Contractor before the effective date of the termination; and <br />6. No claim for damages of any kind or for loss of anticipated profits or consequential damages on <br />deleted or terminated Work will be allowed because of termination or Change Order. Contract <br />Time shall be adjusted as the parties agree. If the parties cannot agree, the Owner’s <br />Representative will determine the adjustment of Contract Time. <br />Acceptable materials ordered by the Contractor prior to the date the Work was terminated or deleted will <br />either be purchased from the Contractor by the Owner at the actual cost and shall become the property of
The URL can be used to link to this page
Your browser does not support the video tag.