My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:32:36 PM
Creation date
4/21/2026 1:25:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 1
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 45 <br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 WO# UP-3815-02 <br /> <br /> <br />00 72 00 - 45 GENERAL CONDITIONS <br />hereby certifies that the Contract Claim for an adjustment to the Contract Sum and/or <br />Contract Time, if any, made herein for Work on this Contract is a true and complete <br />statement of the factual basis of the Contract Claim and all actual costs incurred and time <br />sought, and is fully documented and supported under the Contract between the parties. <br />Date________________________________/s/ _______________________ <br />Subscribed and sworn before me this ____________ day of _______ <br />Notary Public <br />My Commission Expires: ___________________________________________ <br />12.3 FALSE OR OMITTED INFORMATION <br />The Contractor waives each Contract Claim for which it presents material information that it knows, or in <br />the exercise of reasonable care should know, is false, or omits or fails to disclose material information <br />relating to such Contract Claim. In such case, Contractor shall reimburse the Owner for any and all fees <br />and expenses incurred in investigating any such Contract Claim. <br />12.4 REMEDIES <br />12.4.1 General <br />If a Contract Claim has merit in whole or in part, then Contractor’s sole remedies shall be those provided <br />in this subsection. Contractor must timely and strictly comply with the requirements of 10. NOTICE TO <br />OWNER, 11. DIFFERING SITE CONDITIONS, 12. CONTRACT CLAIMS and all other General <br />Conditions relating to the Contract Claim. Adjustments to Contract Time shall be determined pursuant to <br />5.2.2.2 Extensions of Contract Time. Failure to comply strictly and timely shall be deemed a waiver of <br />the Contract Claim. <br />12.4.2 Extra Work <br />12.4.2.1 Adjustment of Contract Sum <br />If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work, the adjustment shall <br />be calculated and paid as provided in 9.5. ADJUSTMENT OF CONTRACT SUM. This amount <br />includes jobsite and home office Overheads for such Work, including any schedule delays relating to such <br />Work. Therefore, no compensation in addition to that provided in 9.6. FORCE ACCOUNT shall be <br />paid for such things as extended Overhead or other costs or damages. <br />12.4.2.2 Extension of Contract Time <br />Extensions of Contract Time caused by Extra Work shall be determined as provided in 5.2.2.2 <br />Extensions of Contract Time. <br />12.4.3 Delays <br />12.4.3. Owner Caused Delay Unrelated to Extra Work <br />12.4.3.1.1 Adjustment of Contract Sum <br />If the Contractor is entitled to an adjustment of Contract Sum because of a Delay solely caused by the <br />Owner that does not relate to Extra Work, Contractor shall only be compensated for the items below, <br />less all funds paid pursuant to any change in the Contract Sum that contributed to the Delay: <br />1. Documented, incurred cost of nonproductive field supervision or labor extended because of the <br />Delay; <br />2. Documented, incurred cost of home office supervision to attend jobsite meetings; <br />3. Documented, incurred cost of temporary facilities or equipment rental extended because of the <br />Delay;
The URL can be used to link to this page
Your browser does not support the video tag.