My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:32:36 PM
Creation date
4/21/2026 1:25:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 1
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 47 <br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 WO# UP-3815-02 <br /> <br /> <br />00 72 00 - 47 GENERAL CONDITIONS <br />The Owner and the Contractor shall not be responsible to compensate each other financially for <br />any Delay to the extent caused by a Third Party or a Force Majeure Event. A Delay caused by a <br />utility’s failure to provide service or relocate its lines (despite a timely request for such service or <br />relocation) is an example of this kind of Delay for which neither the Contractor nor the Owner is <br />financially responsible to the other. Mislocated utility lines or utility lines not located are another <br />example of a Delay for which neither the Contractor nor the Owner is responsible to the other. <br />However, the Contractor’s failure to request a utility locate or relocation in a timely way is not, <br />and any resulting Delay would be the responsibility of the Contractor. Because the Contractor is <br />responsible for ordering materials and Equipment, Contractor shall not be entitled to an <br />adjustment of Contract Time or Contract Sum due to Delays caused by the lack of materials or <br />Equipment. A strike, job action, slowdown, work to rule, or other job action or labor dispute or <br />problem is not a Delay caused by a Third Party for the purposes of section 12.4.3 Delays. <br />12.4.3.4. 2 Adjustment of Contract Time <br />The Contractor shall be entitled to an extension of Contract Time for Delays to the extent caused <br />by a Third Party or Force Majeure Event. Extension of Contract Time shall be determined <br />pursuant to 5.2.2.2 Extensions of Contract Time. <br />12.4.3.5 Extended or Unabsorbed Overhead <br />12.4.3.5.1 General <br />To present a request for additional compensation for Extended or Unabsorbed Overhead, the <br />Contractor has the burden of keeping and maintaining accurate documentation to support any such <br />claim. If the Contractor fails to provide or keep adequate financial data for an accurate and fair <br />Eichleay calculation, Contractor waives and releases any claim for Unabsorbed or Extended <br />Overhead. In presenting any claim under this section of the Contract, the Contractor agrees to provide <br />to the Owner any and all financial data needed by the Owner, or its representative, to review, <br />substantiate and evaluate any claim for Extended and/or Unabsorbed Home Office Overhead. Failure <br />to provide the requested information shall constitute waiver by the Contractor. <br />If Contractor is entitled to an adjustment of Contract Sum for Unabsorbed or Extended Overhead, it <br />shall be calculated as provided in 9.5.3. Unabsorbed and Extended Overhead. <br />12.4.3.5.2 Elements <br />Contractor shall only be entitled to an adjustment of Contract Sum for Unabsorbed or Extended <br />Overhead if it clearly and convincingly demonstrates all of the following: <br />1. The Owner solely caused a delay to the Completion Date as measured by analysis of the project <br />duration by the critical path method pursuant to 5.2.2.2 Extensions of Contract Time; <br />2. Because of such Delay, the Contractor was forced to suspend or significantly interrupt its <br />performance so that it was on standby or idled, and the Owner required the Contractor to be ready <br />to resume performance on short notice. Extended time of performance of Work, such as <br />extensions caused by changes, inefficiencies, or Extra Work, does not constitute suspension or <br />significant interruption of performance. <br />3. The Contractor could not and did not use resources, including but not limited to labor, materials <br />and equipment, standing by or idled on this or any other project for any work during the period of <br />delay; <br />4. The Contractor’s Overhead costs did not materially vary from its usual seasonal Overhead costs <br />during the period of delay; and <br />5. The Delay did not cause Overabsorbed Overhead in the period in which the delayed Work was <br />completed. <br />12.4.3.5.2.1 Resources
The URL can be used to link to this page
Your browser does not support the video tag.