My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:32:36 PM
Creation date
4/21/2026 1:25:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 1
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 45 13 - 1 <br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 WO# UP-3815-02 <br />00 45 13 - 1 BIDDER QUALIFICATION STATEMENT <br />SECTION 00 45 13 <br />BIDDER QUALIFICATION STATEMENT <br /> <br />PROJECT NAME: Port Gardner Storage Facility West Marine View Drive Storm and Combined <br />Sewer – Construction Package 2 <br />CONTRACTOR'S <br />COMPANY NAME: <br />DATE: <br /> <br />ADDRESS: TELEPHONE: <br /> <br />The Bidder must document that the Bidder meets the Supplemental Responsibility Criteria in the <br />Supplemental Instructions to Bidders (Section 00 22 13). The Bidder should provide additional <br />sheets to fully describe referenced projects and experience. <br />1. The Supplemental Instructions to Bidders (Section 00 22 13) states that the Bidder must <br />have successfully completed at minimum three projects within ten years prior to bid <br />opening involving the construction of at least 1,000 continuous linear feet of buried <br />stormwater or municipal wastewater pipeline having a minimum diameter of 30 inches <br />and reaching a depth of at least 15 feet for the invert elevation for portions of the <br />pipeline. Three separate projects must be used to satisfy this requirement. List the <br />projects that show that Bidder has this experience. <br /> PROJECT NAME YEAR OWNER LOCATION CONTRACT VALUE <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.