City of Everett 00 52 13 - 1 <br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 WO# UP-3815-02 <br />00 52 13 - 1 AGREEMENT FORM <br />SECTION 00 52 13 <br />AGREEMENT FORM <br /> <br />CONTRACT <br />THIS CONTRACT is made and entered by and between the City of Everett, Washington, <br />a municipal corporation existing under the laws of the State of Washington (the “City”) <br />and ______________________________________, (the “Contractor”). <br /> <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br />agrees to furnish all labor, tools, materials, equipment, and supplies required to complete <br />in a workmanlike manner the work, improvements, and/or appurtenances in accordance <br />with the Specifications and Drawings and all other Contract Documents entitled: “Port <br />Gardner Storage Facility – West Marine View Drive Storm and Combined Sewer- <br />Construction Package 2” (the “Project”). <br />1. Contract Documents. The “Contract Documents” are defined in the General <br />Conditions. The Contract Documents are part of this Contract and are hereby <br />incorporated by reference. Terms that are capitalized in a Contract Document but not <br />defined in that Contract Document shall have the meaning defined to them in the other <br />Contract Documents. A copy of the Contract Documents that were posted for the <br />Project on Builder’s Exchange of Washington (www.bxwa.com) as of Bid Opening Date <br />is maintained by the City Clerk’s Office as a single pdf and is available as follows: <br />Link to PDF <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to <br />signing this Contract. City and Contractor agree that this pdf contains all posted <br />Contract Documents as of the Bid Opening Date. City and Contractor further agree that <br />this pdf may contain some other documents (such as Reference Information) that are <br />not Contract Documents. <br />2. Contract Time. Substantial Completion of the Work shall be achieved within <br />Three Hundred Fifty-Eight (358) Working Days after the effective date of the Notice to <br />Proceed. Physical Completion shall be within Thirty (30) calendar days after the actual <br />date of issuance of Substantial Completion.