My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Injection Grouting <br />Project No. 180162 03 64 00 - 2 <br /> <br />C. Manufacturer’s Representative <br />1. The Manufacturer’s Representative is authorized to act on behalf of the <br />manufacturer regarding technical issues. They shall provide technical support to <br />resolve field issues throughout the duration of the work. <br />2. The Manufacturer’s Representative shall be available to the Owner and Construction <br />Manager and spend at least 8 hours on-site providing field inspections of grouting <br />activities. <br />3. The Manufacturer’s Representative shall verify in writing that the proper procedures <br />and equipment are used by the Contractor and installer and that the grout is being <br />applied per the manufacturer’s recommendations. <br />1.03 SUBMITTALS <br />A. In accordance with Section 01 33 000, SUBMITTAL PROCEDURES. <br />B. Action Submittals: <br />1. A copy of this specification section, with addendum updates included, and <br />referenced and applicable sections, with addendum updates included, with each <br />paragraph check-marked to indicate specification compliance or marked to indicate <br />requested deviations from specification requirements. A check mark shall denote full <br />compliance with a paragraph as a whole. If deviations from the specifications are <br />indicated, and therefore requested by the Contractor, each deviation shall be <br />underlined and denoted by a number in the margin to the right of the identified <br />paragraph, referenced to a detailed written explanation of the reasons for requesting <br />the deviation. The Construction Manager shall be the final authority for determining <br />acceptability of requested deviations. The remaining portions of the paragraph not <br />underlined will signify compliance on the part of the Contractor with the <br />specifications. Failure to include a copy of the marked-up specification sections, <br />along with justification(s) for any requested deviations to the specification <br />requirements, with the submittal shall be sufficient cause for rejection of the entire <br />submittal with no further consideration. <br />2. Grouting plan(s) including but not limited to: <br />a. Grouting Contractor’s name, contact information, list of key personnel and <br />experience for Company and installers performing the work. <br />b. Chemical grout, grout mixture ratio (including additives), and gel times. <br />c. LDCC mix design including foaming agent and admoxtures. <br />d. Equipment operating procedures and systems to be used, including <br />manufacturer’s literature on grout pumps, packers, and lateral blockage clearing <br />equipment. <br />3. Upon completion of grouting each reach, submit to Owner and Construction Manager <br />a report showing the following data for each joint tested and/or grouted or attempted <br />to be grouted. <br />a. Stationing. <br />b. Time and date. <br />c. Grout mixture formation, including additives and catalyst mixture formulation and <br />proportion of each. Include procedure for adjusting grout mixture for variations in <br />ambient temperatures and changes of temperature of grout through hoses <br />exposed to the atmosphere.
The URL can be used to link to this page
Your browser does not support the video tag.