My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Concrete Repair <br />Project No. 180162 03 01 00 - 10 <br /> <br />3.06 REINFORCING REPAIR <br />A. After preparation and prior to application of anti-corrosion inhibitor (where applicable), <br />inspect existing reinforcing bars for deterioration. Notify Engineer where section loss of <br />reinforcing bar is more than 25 percent, or 20 percent in two or more adjacent bars. <br />B. As directed by Engineer, add supplemental and/or replacement reinforcing. <br />1. Install new reinforcing by tying to existing remaining reinforcing. <br />2. Provide final touchup protection by re-application of anti-corrosion inhibitor to <br />reinforcing surfaces, scratches, damaged areas, etc. <br />3.07 SURFACE MORTAR APPLICATION <br />A. Apply mortar according to manufacturer’s written instructions. <br />B. For hand troweled or spray applied applications, work material firmly into the sides and <br />bottom of repair area. Apply a scrub coat prior to full depth application. Build up <br />prepared areas in multiple lifts as required by product manufacturer limitations. <br />C. For hand troweled or spray applied applications, follow manufacturer’s recommendations <br />for maximum lift thickness, additional surface preparation, and subsequent reapplication <br />time. <br />D. Finish surface to match existing adjacent concrete surfaces and/or as required per <br />coating manufacture’s recommendations. <br />E. Moist cure mortar repair for a minimum of 5-days or in accordance with manufacturer’s <br />recommendations. <br />F. Notify Engineer for observation after repair mortar has been applied at the initial mockup <br />area and after the repair has cured. Notify Engineer again at intervals specified or as <br />subsequent repair mortar is applied and cured. Once scheduled, allow at least 48 hours <br />for observation by Engineer and/or inspection by Owner’s testing agency for pull-off <br />tensile bond strength testing. <br />G. Coordinate with Engineer and Owner’s testing lab to provide up to six (6) smooth test <br />areas for pull-off testing at the completed mortar repair areas. Test areas shall be <br />prepared by Contractor by grinding smooth. The first completed repair area shall be <br />provided at the mockup area with the remaining five (5) areas to be selected after the <br />mortar repair application is completed. <br />H. Contractor to provide follow up repairs to pull-off test areas. <br />3.08 EPOXY CRACK INJECTION <br />A. Expose identified cracks by lightly grinding along length of crack. Clean crack and <br />adjacent areas with oil-free compressed air or low-pressure water to remove loose <br />particles. Do not use acids or corrosives for cleaning. Notify Engineer for observation of <br />crack repair areas prior to epoxy crack injection. Allow at least 48 hours advance notice <br />for observation by Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.