My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer - Construction Package 2 Concrete Forming <br />Project No. 180162 03 11 00 - 1 <br /> <br />SECTION 03 11 00 <br />CONCRETE FORMING <br />PART 1 GENERAL <br />1.01 DESCRIPTION <br />A. Formwork requirements for concrete construction. <br />1.02 QUALITY ASSURANCE <br />A. References: <br />1. The references listed below are part of this section. Where a referenced document <br />cites other standards, such standards are included as references under this section <br />as if referenced directly. In the event of conflict, the requirements of this section shall <br />prevail. <br /> <br />Reference Title <br />ACI 117 Tolerances for Concrete Construction and Materials <br />ACI 301 Specifications for Structural Concrete <br />ACI 318 Building Code Requirements for Structural Concrete <br />ACI 350 Code Requirements for Environmental Engineering Concrete Structures <br />ACI 350.5 Specifications for Environmental Concrete Structures <br />National Institute of <br />Standards - PS1 <br />Construction and Industrial Plywood <br />B. Design – General: <br />1. Provide design of formwork, shoring and reshoring systems by the Contractor’s <br />Professional Engineer currently registered in the State of Washington <br />2. Design, engineering, and construction of formwork, shoring, and reshoring systems is <br />the responsibility of the Contractor. <br />3. Develop a procedure and schedule for removal of shores (and installation of <br />reshores). <br />4. Structural record calculations, signed and sealed by the Contractor’s Engineer, are <br />required to prove that all portions of the structure, in combination with the remaining <br />forming and shoring systems, have sufficient strength to safely support their own <br />weight plus the loads placed thereon. <br />5. When developing procedures, schedules, and structural calculations; consider the <br />structural system that exists, effects of imposed loads, and the strength of concrete <br />at each stage of construction. <br />C. Design Criteria: <br />1. Design formwork in accordance with ACI 301 and ACI 318 for building structures and <br />ACI 350 and 350.5 for environmental structures to provide concrete finishes as <br />specified in Section 03 30 00. <br />2. Design systems for full height of wet concrete pressure. <br />3. Design formwork to limit maximum deflection of form facing materials, as reflected in <br />concrete surfaces exposed to view, to 1/240 of span.
The URL can be used to link to this page
Your browser does not support the video tag.