My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer - Construction Package 2 Concrete Forming <br />Project No. 180162 03 11 00 - 4 <br /> <br />J. At platforms constructed to move equipment over in-place reinforcement, provide beams, <br />struts, and/or legs, supported directly on formwork or other structural members without <br />resting on reinforcing steel. <br />K. Provide a positive means of adjustment (wedges or jacks) at shores and struts to take up <br />settlement during concrete placement. Brace forms against lateral deflection. Fasten in- <br />place wedges and shims used for final adjustment of forms prior to concrete placement. <br />L. Place tapered through-bolt form ties with the larger end on the side of the structure in <br />contact with liquid. <br />3.03 TOLERANCES <br />A. Install formwork with tolerances in accordance with ACI 117 and the following (the more <br />stringent requirement controls): <br />1. Install formwork in accordance with manufacturer’s written instructions. <br />2. Vertical surface tolerance from plumb; walls, columns, piers, and risers: <br />± 1/2 inch for entire height <br />± 1/4 inch in any 10 feet of height <br />3. Vertical surface tolerance from plumb; exposed wall corners, end columns, control- <br />joint grooves, and other exposed to view vertical lines: <br />± 1/2 inch for entire height <br />± 1/4 inch in any 20 feet of height <br />4. Horizontal variation from level or from grade; top of slabs, slab soffits, ceilings, and <br />beam soffits, measured before removal of supporting shores: <br />± 3/4 inch for entire length <br />± 3/8 inch for any bay or 20 foot length <br />± 1/4 inch in any 10 feet of length <br />5. Horizontal variation from level or from grade; exposed lintels, sills, parapets, <br />horizontal grooves, and other exposed-to-view horizontal lines: <br />± 1/2 inch for entire length <br />± 1/4 inch in any 20 feet of length. <br />6. Plan position variation; columns, walls, and partitions: <br />± 3/4 inch for entire length <br />± 3/8 inch for any bay or 20 foot length <br />7. Plan location and size; sleeves, floor openings, walls, wall openings, beams, and <br />columns: <br />± 1/2 inch <br />8. Cross sectional dimensions; columns and beams and thickness of slabs and walls: <br />± 3/8 inch <br />9. Plan dimensions; footings and foundations: <br />minus 1/2 inch <br />+ 2 inches <br />10. Misplacement or eccentricity; footings and foundations: <br />2 percent of footing width in direction of misplacement <br />not more than 2 inches
The URL can be used to link to this page
Your browser does not support the video tag.