My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer - Construction Package 2 Concrete Reinforcing <br />Project No. 180162 03 20 00 - 5 <br /> <br />7. Tack welding or bending reinforcing steel bars by means of heat is prohibited. <br />8. Where required by the contract documents, reinforcing steel bars shall be embedded <br />into the hardened concrete utilizing an adhesive anchoring system specifically <br />manufactured for that application. Installation shall be per the manufacturer’s <br />written instructions. <br />9. Bars with kinks or with bends not shown shall not be used. <br />10. Heating or welding bars shall be performed in accordance with AWS D1.4 and shall <br />only be permitted where specified or approved by the Owner’s Representative. Bars <br />shall not be welded at the bend. <br />3.06 FIELD QUALITY CONTROL <br />A. Field quality control shall include the following: <br />1. Notify the Owner’s Representative whenever the specified clearances between the <br />reinforcing steel bars cannot be met. The concrete shall not be placed until the <br />Contractor submits a solution to the congestion problem and it has been approved by <br />the Owner’s Representative. <br />2. The reinforcing steel bars may be moved as necessary to avoid other reinforcing steel <br />bars, conduits or other embedded items provided the tolerance does not exceed that <br />specified in this section. The Engineer’s approval of the modified reinforcing steel <br />arrangement is required where the specified tolerance is exceeded. No cutting of the <br />reinforcing steel bars shall be done without written approval of the Owner’s <br />Representative. <br />3. Coated reinforcing steel bars will be inspected on the jobsite for handling defects, <br />coating abrasion, coating thickness and continuity of coating. The Owner’s <br />Representative may defer final inspection of the coated reinforcing steel bars until <br />bar erection and handling is complete. Repair coated areas as directed by the <br />Owner’s Representative and completed prior to concrete placement. <br />4. An independent laboratory shall be employed to review and approve Contractor <br />welding procedures and qualify welders in accordance with AWS D1.4. The laboratory <br />shall visually inspect each weld for visible defects and conduct non-destructive field <br />testing (radiographic or magnetic particle) on not less than one sample for each 10 <br />welds. If a defective weld is found, the previous 5 welds by the same welder shall <br />also be tested. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.