My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer - Construction Package 2 Cast-in-Place Concrete <br />Project No. 180162 03 30 00 - 4 <br /> <br />13. Samples of concrete floor and slab for each finish specified in Part 3 approximately <br />four feet square and a minimum of four inches thick, with one construction joint and <br />one expansion joint, if used. <br />14. Concrete delivery truck tickets showing the information listed in ASTM C94, <br />section 14. <br />1.05 QUALITY ASSURANCE <br />A. Quality Control By Owner: <br />1. Special Inspection of concrete work shall be performed by the Special Inspector <br />under contract with the Owner and in conformance with the IBC Chapter 17. Special <br />Inspection of concrete is in addition to, not replacing, other inspections and quality <br />control requirements specified herein. Where sampling and testing specified herein <br />conforms to Special Inspection standards, such sampling and testing need not be <br />duplicated. <br />2. All structural concrete work shall receive Special Inspection in accordance with IBC <br />Chapter 17. Structural concrete includes elements which resist code-defined loads <br />and whose failure would impact life safety. Non-structural site work concrete does <br />not require Special Inspection. Anchor bolts and anchors installed in hardened <br />concrete require Special Inspection. <br />3. Refer to Section 01 45 23 Testing and Inspection Services for Owner provided <br />testing. <br />B. Quality Control By Contractor: <br />1. Where required to demonstrate conformance with the specified requirements for <br />cast-in-place concrete, the Contractor shall provide the services of an independent <br />testing laboratory which complies with the requirements of ASTM E329 and ASTM <br />C1077. The testing laboratory shall sample and test concrete materials as specified <br />in this section. Costs of testing laboratory services shall be borne by the Contractor. <br />2. Concrete testing laboratory personnel shall be certified in accordance with the ACI <br />Concrete Laboratory Testing Technician – Level 1 Certification Program or the ACI <br />Concrete Strength Testing Technician Certification Program, or an equivalent <br />program. <br />3. Refer to Section 01 45 00 Quality Control. <br />C. Basis For Quality: <br />1. Cast-in-place concrete shall conform to the requirements of ACI 301, except as <br />modified herein. <br />D. Concrete Conference <br />1. Contractor shall schedule and conduct a meeting to review the specification <br />requirements and the proposed concrete design mixes, including procedures for <br />producing proper concrete construction. Hold the meeting no later than 28 days after <br />the Notice to Proceed. <br />2. All parties involved in the concrete work shall be included to attend the conference, <br />including the following: Contractor's representative, testing laboratory, concrete <br />subcontractor, concrete supplier, reinforcing steel subcontractor, Owner’s <br />Representative, and Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.