My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer - Construction Package 2 Cast-in-Place Concrete <br />Project No. 180162 03 30 00 - 13 <br /> <br />C. Curing and sealing compound shall be certified compliant with final finish system if <br />applicable, including compatibility with floor hardeners in areas where floor hardeners <br />are specified to be used. <br />PART 3 EXECUTION <br />3.01 GENERAL <br />A. Use only truck-mixed, ready-mixed concrete conforming to ASTM C94. Proportion <br />materials by weighing. <br />B. Introduce pozzolan into the mixer with cement and other components of the concrete <br />mix; do not introduce pozzolan into a wet mixer ahead of other materials or with mixing <br />water. <br />C. Introduce water at the time of charging the mixer; additional water may be introduced <br />within 45 minutes from charging the mixer, provided the specified w/c ration and slump <br />is not exceeded and the maximum total water per the approved mix design is not <br />exceeded. <br />D. Arrange with the testing laboratory for inspection as required to comply with these <br />specifications. <br />E. Deliver concrete to the site and complete discharge within 90 minutes after introduction <br />of water to the mixture. Extension of allowable time beyond this limit requires a <br />Contractor proposed remedial action plan to be reviewed and accepted by the Owner’s <br />Representative. <br />3.02 CONVEYING AND PLACING CONCRETE <br />A. Convey concrete from the mixer to the forms in accordance with ACI 301. Remove <br />concrete that has segregated in conveying from the site of the work. <br />B. Placing Concrete: <br />1. General: <br />a. Place concrete in accordance with ACI 301. Do not permit concrete to drop freely <br />more than 4-ft (6-ft when superplasticizer is used). <br />2. Placing Concrete By Pumping: <br />a. Concrete placed by pumping is at Contractor’s discretion and shall not be the <br />cause to change or relax specified mix design characteristics. Concrete shall <br />possess the specified characteristics at the point of placement. <br />b. Measure slump at the hose discharge, except as follows: Initial slump testing in <br />each placement shall occur at both the pumping unit inlet hopper and hose <br />discharge. Slump loss in pumping, measured between the inlet hopper and the <br />hose discharge, shall not exceed 1 inch. After these criteria have been satisfied, <br />slump may be measured at the inlet hopper with allowable slump increased by <br />the earlier measured difference, not to exceed 1 inch.
The URL can be used to link to this page
Your browser does not support the video tag.