My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLP L PL <br />PL <br />PL PL PL <br />PL <br />PL <br />PL <br />PL <br />PL <br />PL PL P L <br />PL <br />PL P <br />LPL PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL <br />PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLXXXXX305 <br />101 <br />102 <br />106 <br />111 <br />112 <br />115118 <br />119 <br />204 <br />205 <br />228229 <br />230 <br />231 <br />232 <br />233 <br />242 <br />243 244 <br />245 <br />246 <br />247 <br />304 306 307 <br />308 <br />309 <br />400 <br />401 <br />402 <br />403 <br />404 <br />405 <br />406 <br />407 <br />410 <br />MIC <br />59.64 <br />411 <br />MIC <br />80.20 <br />412 <br />MIC <br />84.99 <br />500 <br />50273 <br />MIC <br />37.13 <br />50275 <br />MIC <br />35.06 <br />50278 <br />MIC <br />38.39 <br />50279 <br />MIC <br />37.38 <br />50280 <br />MIC <br />36.06 <br />50281 <br />MIC <br />43.27 <br />50283 <br />MIC <br />77.63 <br />PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL <br />PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL PL PL P L PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL1500PL PL PL PL P L PL PL PL P L PL PL PL P L PL PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL <br />105 <br />122 <br />123 <br />124 <br />125 <br />126 <br />201 <br />206 <br />207 <br />208 <br />210 <br />211 <br />212 <br />213 <br />214 <br />215 <br />216 217 218 219 220 <br />221222223 <br />224225 <br />226 <br />227 <br />234 <br />235 <br />236 <br />237 <br />238 <br />240 <br />301 <br />MIC <br />98.19 <br />302 <br />MIC <br />83.07 <br />303 <br />408 <br />414 <br />MIC <br />93.67 415 <br />MIC <br />105.01 <br />11374 <br />MIC <br />99.60 <br />11375 <br />60902026093501 <br />50271 <br />MIC <br />24.82 <br />209Surveyed By Date Control Monument City of Everett Field Book/Starting Page / Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\001 G\SHEETS\3815-02-V-2021.DWGPlot date 12/8/2025 9:25 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name Everett Sheetset 2016 <br />? <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> <br />GENERAL <br />SURVEY CONTROLS 1 <br />V-2021 <br />9 <br />E. OSWALD <br />E. OSWALD <br />R. DAVIES <br />HOYT AVE SEE CONTINUATION BELOWWEST MARINE VIEW DRIVE <br />SEE CONTINUATION ABOVEHEWITT AVECALIFORNIA STEVERETT AVE26TH ST25TH ST24TH ST23RD ST22ND ST21ST ST20TH ST19TH STGRAND AVE <br />RUCKER AVE <br />GRAND AVE <br />HOYT AVE <br />LOWER NORTO <br />N <br /> <br />A <br />V <br />E <br />18TH ST16TH ST17TH ST19TH ST18TH STSEINER DR15TH STGRAND AVE <br />RUCKER AVE <br />WEST MARINE VIEW DRIVE <br />WEST MARINE VIEW DRIVE <br />WEST MARINE VIEW D <br />R <br />I <br />V <br />E <br />1.HORIZONTAL DATUM: PROJECT SYSTEM DERIVED <br />FROM THE WASHINGTON STATE PLANE COORDINATE <br />SYSTEM, NORTH ZONE 4601, <br />NAD83(2011)EPOCH2010.0, US SURVEY FOOT. <br />2.VERTICAL DATUM: NAVD88. <br />3.BASIS OF BEARINGS: WASHINGTON STATE PLANE <br />COORDINATE SYSTEM, NORTH ZONE 4601, <br />NAD83/2011, US SURVEY FOOT (GRID) S07° 44' 56"W <br />[FND MAG NAIL FROM 19-179 PREVIOUS PORT <br />GARDNER JOB TO FND MAG NAIL FROM 19-179 <br />PREVIOUS JOB. <br />4.PROJECT BENCHMARK: MAG NAIL FROM 19-179 <br />PREVIOUS PORT GARDNER JOB(1-ALLIANCE #101) <br />ELEV =17.85. <br />5.FIELD WORK FOR WORK ORDER 3815 WAS <br />PERFORMED IN OCTOBER 2023 THROUGH FEBRUARY <br />2024. MONUMENTS AND CONTROL POINTS SHOWN <br />HEREIN WERE VISITED AND/OR SET IN OCTOBER 2023 <br />THROUGH FEBRUARY 2024. <br />6.CONTOURS SHOWN ARE DERIVED FROM DIRECT <br />FIELD OBSERVATIONS. <br />7.THE PROJECT SCALE FACTOR (COMBINED) USED FOR <br />THIS PROJECT IS 0.99994158. <br />8.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />9.UTILITY LOCATES FOR THIS PROJECT WERE <br />PERFORMED BY APPLIED PROFESSIONAL SERVICES <br />425-510-5174. <br />10.REFER TO DWG V-2022 FOR SURVEY POINT TABLE. <br />BNSF RAILWAY <br />GENERAL NOTES <br />LEGEND <br />PORT GARDNER <br />STORAGE FACILITY <br />RAILROAD CENTERLINE (NOT SHOWN) <br />RAILROAD RIGHT-OF-WAY <br />RAILROAD SETBACK EASEMENT (NOT SHOWN) <br />CITY EASEMENT <br />RIGHT-OF-WAY BOUNDARY <br />MONUMENT LINE <br />MONUMENT IN CASE (MIC) <br />SURFACE MONUMENT (MON) <br />HUB & TACK (MHT) <br />MAG NAIL (MAG) <br />REBAR W/ CAP (MRC) <br />SCRIBED "X" (MSX) <br />SPIKE (MSP) <br />12/09/2025 <br />d8009364cb93ae88409186c7f9d7b64e
The URL can be used to link to this page
Your browser does not support the video tag.