Laserfiche WebLink
WEST MARINE VIEW DRIVE <br />217 <br />223 <br />29051800301200 <br />W MARINE VIEW DR <br />29051800301100 <br />UNKNOWN <br />WEST MARINE VIEW DRIVE <br />D <br />CD-2610 18TH ST16 <br />16 <br />15 <br />17 <br />16 <br />17 <br />16 <br />EX 3" W DIP <br />ABAND <br />EX 8" SS <br />EX 1" NGAS <br />ABAND <br />EX 8" SD CONC <br />EX 12" W DIP <br />EX 48" WIDE CDF DUCT BANK <br />EX 3/4" W <br />ABAND <br />1 <br />STUBOUT TO <br />RETIRED <br />REGULATOR <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2067.DWGPlot date 12/8/2025 10:39 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />10 402020FEET0 <br />CIVIL <br />UTILITY RELOCATION PLAN - 8 <br />C-2067 <br />29 <br />B. O'NEILL <br />T. FRANKLIN <br />K. WEBER <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br />  MATCHLINESEE DRAWING C-2068Know what's below. <br />before you dig.Call <br />RMATCHLINESEE DRAWING C-2066GENERAL NOTES <br />GAS CONSTRUCTION NOTES <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST <br />BE PERFORMED IN ACCORDANCE WITH PSE AND <br />SNOPUD REQUIREMENTS. COORDINATE <br />CONSTRUCTION ACTIVITIES AND SCHEDULE WITH <br />UTILITY OWNERS. SEE SECTION 02 01 10 AND <br />SECTION 02 01 20. <br />3.EXISTING WATER LINE CAN BE REMOVED FROM <br />SERVICE DURING INSTALLATION PER SECTION 01 12 <br />16 AND SECTION 02 01 10 SOUTH OF THE PGSF <br />FACILITY. MAINTAIN WATER SERVICE AT THE PGSF <br />FACILITY AND TO THE NORTH AT ALL TIMES. <br />1 GAS LINE TO BE RELOCATED BY PSE. CONFIRM <br />LOCATION OF RELOCATED GAS. <br />12/09/2025