Laserfiche WebLink
PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL219 <br />220 <br />221 <br />29051800210400 <br />615 MILLWRIGHT LOOP N <br />PL P L PL P L PL P L P L P L P L P L P L P L P L PL P L PL P L PL P L PL P L PL P L P L P L P L P L P L P L PL P L PL P L PL P L PL P L P L P L PL P L P L P L P L P L P L PL <br />PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPWEST MARINE VIEW DRIVE <br />EX 6" IPG <br />EX 12" HPG <br />EX 18" SD CONC <br />EX 8" W DIP <br />EX 8" SD CMP <br />F <br />CD-2610 G G G G G G G GG G G G G G G GG2 <br />1 <br />515 <br />20 <br />21 <br />22 <br />2315+0015+9519 <br />24 <br />25 1 <br />12" STU HP MAIN, PSE <br />UTILITY RELOCATION 60% <br />6" PE IP MAIN, PSE UTILITY <br />RELOCATION 60% <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2069.DWGPlot date 12/8/2025 10:40 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />10 402020FEET0 <br />CIVIL <br />UTILITY RELOCATION PLAN - 10 <br />C-2069 <br />31 <br />B. O'NEILL <br />T. FRANKLIN <br />K. WEBER <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br />   <br />Know what's below. <br />before you dig.Call <br />RMATCHLINESEE DRAWING C-2068GENERAL NOTES <br />WATER CONSTRUCTION NOTES <br />GAS CONSTRUCTION NOTES <br />WATER KEY NOTES <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST <br />BE PERFORMED IN ACCORDANCE WITH PSE AND <br />SNOPUD REQUIREMENTS. COORDINATE <br />CONSTRUCTION ACTIVITIES AND SCHEDULE WITH <br />UTILITY OWNERS. SEE SECTION 02 01 10 AND <br />SECTION 02 01 20. <br />3.EXISTING WATER LINE CAN BE REMOVED FROM <br />SERVICE DURING INSTALLATION PER SECTION 01 12 <br />16 AND SECTION 02 01 10 SOUTH OF THE PGSF <br />FACILITY. MAINTAIN WATER SERVICE AT THE PGSF <br />FACILITY AND TO THE NORTH AT ALL TIMES. <br />1 GAS LINE TO BE RELOCATED BY PSE. CONFIRM LOCATION <br />OF RELOCATED GAS. <br />1 <br />1 <br />1 CONNECT TO EXISTING WATER MAIN IN <br />ACCORDANCE WITH SECTION 02 01 10. POTHOLE <br />LOCATION PRIOR TO PROCUREMENT OF FITTINGS <br />AND COUPLINGS. CONNECTION TO EXISTING <br />WATER LINES MUST BE BY COE FORCES. SEE C-2034. <br />2 DEMOLISH EX 8" W AND ALL APPURTENANCES. <br />REMOVE IN ITS ENTIRETY. REPLACE WITH 8" DI W <br />PER COE REQUIREMENTS. <br />19 APPROX STA. 15+00 PROVIDE: <br />(1) POTHOLE LOCATION PER WATER CONSTRUCTION <br />NOTE 1 <br />(1) CONNECT TO EX 8" W <br />20 APPROX STA. 15+39 PROVIDE: <br />(1) 8" DI 90° ELBOW <br />21 APPROX STA. 15+63: <br />RELOCATE EX 8" DCDA AND VAULT AND CONNECT TO <br />EX SERVICE LINE WITH APPROPRIATE FITTINGS <br />22 RELOCATE 2" METER SERVICE AND BOX. CONNECT TO <br />EX 2" HDPE WATER SERVICE <br />23 APPROX STA. 15+69 PROVIDE: <br />(1) 8" DI 90° ELBOW <br />24 APPROX STA. 15+84 PROVIDE: <br />(1)8" DI 45° ELBOW <br />25 APPROX STA. 15+90 PROVIDE: <br />(1)8" DI 45° ELBOW <br />(1)POTHOLE LOCATION PER WATER CONSTRUCTION <br />NOTE 1 <br />(1)CONNECT TO EX 8" W <br />12/09/2025