My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />30 <br />35 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />30 <br />35 <br />36+6036+8037+0037+2037+4037+6037+8038+0038+2038+4038+6038+8039+0039+2039+4039+6039+8040+0040+2040+40 SSMH 01072" TYPE 3 MODIFIEDW/ ENCASEMENTRIM=21.3948" SS 161.53LF @ 1.00% <br />48" SS 184.63LF @ 0.40%16" W DIPSTA. 37+39.54TOP=22.2±6" HPGSTA. 37+44.23TOP=21.9±EXISTING GROUND COMMSTA. 37+50.75TOP=22.0±STA. 39+10.20IE = 7.69BNSF RAILROAD ROW <br />STA. 37+74.11STA. 38+64.1112" SS CONCSTA. 38+77.72IE=UNKOWNSTA. 40+26.13STA. 38+83.03STA. 38+95.77STA. 38+85.8048" IE = 7.94STA. 37+45.0748" IE = 9.3560" CASING 140.73LF @ 1.00%1CD-2601ACD-2612STA. 40+11±TYPICAL ASPHALT <br />PAVEMENT PER <br />DETAIL 1/CX-2011 <br />ASPHALT PAVEMENT W/ <br />MULTI LAYER GEOGRID <br />PER DETAIL 2/CX-2011 <br />ACCESSWAYSTA. 38+99.70IE = 7.8048" SS 273.02LF @ 1.68% <br />48" SS 8.45LF @ 0.00%STA. 37+38.18SSMH 009RIM=25.57TRENCH PER <br />DETAIL A/CD-2602 <br />TRENCHLESS INSTALLATION SEE DWG C-2801 TRENCH PER DETAIL D/CD-2602 <br />WITH CLSM PER SECTION 31 23 00 <br />ELEV = 22.60±60" IE=7.44STA. 38+85.8060" IE=8.85STA. 37+45.0748" SS 10.50LF <br />@ 1.00% <br />CONTRACTOR'S <br />LAUNCH PIT <br />CONTRACTOR'S <br />RECEIVING PIT <br />IE = 9.41 <br />IE = 15.75 <br />STA. 37+29.73IE = 15.75APPROX TRENCH <br />CUT-OFF WALL (TYP) <br />2 <br />CD-2608 <br />RESTRAIN ALL JOINTS <br />1 <br />1 <br />1 <br />443 <br />3 2 <br />1PLPLPLPLPLPLPLPLPLPLEASEMENT AFN 201907310975PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL229 <br />50275 <br />MIC <br />35.06 <br />01102600000100 <br />1215 24TH ST <br />01102600000200 <br />1217 24TH ST <br />00437448500000UNKNOWN00437455701600UNKNOWN361LF CONC GUTTER TO CB737+0038+0039+0040+00 <br />48" SS48" SS2221252626 35352222LIMITS OF TRENCHLESS <br />INSTALLATION, TYP <br />#7 <br />#6 <br />HWA-7P-24 <br /> <br /> <br />HWA-7VW-25 <br /> <br /> <br />EX 16" W DIP <br />EX 6" HPGEX 12" SS CONC10.7'10.9'24TH ST <br />D <br />CD-2609 <br />BNSF RAILROAD ROW <br />4 <br />1 <br />CD-2601 <br />EX. MONITORING WELL. <br />ABANDON PRIOR TO <br />CONSTRUCTION <br />WMVD RETAINING <br />WALL <br />15 <br />5 <br />15 <br />WEST MARINEVIEW DRIVEE <br />CD-2609 <br />CO28 <br />CO20 <br />CO19 <br />EX 32" SS PEP <br />IE=-57.0±PORT OF EVERETTNORTON TERMINAL14 <br />3 <br />3 <br />3 <br />SSMH 009 <br />STA. 37+38.18 <br />N:362670.96, E:1302263.66 <br />Δ 87° 00' 26" HORIZ <br />MANHOLE <br />ENLARGED <br />PLANS <br />1 <br />CD-2612 <br />POTHOLE APS PH 15 <br />GROUND 16" WATER EL=25.4 <br />TOP OF WATER PIPE=22.2 <br />POTHOLE APS PH 16 <br />GROUND 6" GAS EL=25.3 <br />TOP OF 6" GAS PIPE=21.9 <br />POTHOLE APS PH 17 <br />GROUND COMM EL=25.0 <br />TOP OF COMM PIPE=22.0 <br />22 20 <br />21 <br />PE AREA 4 <br />TCE AREA 2 <br />TCE AREA 3 <br />STA. 39+10.20 (PI) <br />N:362685.35, E:1302092.24 <br />Δ <br />W/ ENCASEMENT <br />92° 19' 42" HORIZ <br />SSMH 010, TYPE 3 MODIFIED <br />W/ ENCASEMENT <br />STA. 38+99.70 <br />N:362684.47, E:1302102.70 <br />Δ 0° 00' 00" HORIZ <br />BUILDING OR STRUCTURE FOUNDED ON <br />STEEL H-PILES. <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2107.DWGPlot date 12/8/2025 11:45 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />COMBINED SEWER <br />WMVD - 48" SS <br />PLAN AND PROFILE - STA 36+60 TO 40+40 <br />C-2107 <br />33 <br />R. DAVIES <br />T. FRANKLIN <br />K. WEBER <br />PROFILE <br />SCALE: HORIZ: 1"=20' VERT:1"=5' <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> <br />MATCHLINE STA 40+40 <br />SEE DRAWING C-2108 <br />MATCHLINE STA 36 <br />+ <br />6 <br />0 <br />SEE DRAWING C-2 <br />1 <br />0 <br />6 <br />GENERAL NOTES <br />KEY NOTES <br />LEGEND <br />TRENCHLESS CROSSING 1 <br />C-2801 <br />1 PROVIDE SN72 PN50 FRP PIPE PER SECTION 33 05 36. <br />ALL JOINTS TO BE RESTRAINED WHERE SPECIFIED. <br />2 PROVIDE SN46 PN25 FRP PIPE PER SECTION 33 05 36. <br />3 DEMOLISH STEEL PILES AND REINFORCED CONCRETE <br />FOUNDATION AS REQUIRED TO COMPLETE THE WORK. <br />SEE SHEETS CX-2021 AND CX-2022. <br />4 PROVIDE SHOP FABRICATED FRP FITTING PER SECTION <br />33 05 36. RESTRAIN JOINTS AS SPECIFIED. <br />5 PROVIDE NOTIFICATION, EXCAVATION AND STANDBY <br />PER UTILITY OWNER REQUIREMENTS. <br />14 GAS LINE TO BE RELOCATED BY PSE. CONFIRM <br />LOCATION OF RELOCATED GAS. <br />15 RELOCATE EX WATER LINE. MAINTAIN SERVICE DURING <br />CONSTRUCTION. <br />20 SUBMIT SHOP DRAWINGS FOR ACCESSWAY TEE BASE, <br />BEND W/ ENCASEMENT AND CARRIER PIPE ASSEMBLY. <br />CONFIRM CLEARANCE TO END OF CASING REQUIRED <br />TO INSTALL CARRIER PIPE AND PARALLEL PIPE AND <br />APPURTENANCES. <br />21 PROVIDE MANHOLE FOUNDATION PER DETAIL <br />6/CD-2601. OVEREXCAVATE EXISTING SUBGRADE <br />APPROX 3-FT TO COMPETENT MATERIAL <br />22 SUBMIT SHOP DRAWINGS FOR ACCESSWAY TEE BASE, <br />BEND AND CARRIER PIPE ASSEMBLY. CONFIRM <br />CLEARANCE TO END OF CASING REQUIRED TO INSTALL <br />CARRIER PIPE AND PARALLEL PIPE AND <br />APPURTENANCES. <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF UNDERGROUND <br />UTILITIES BEFORE BEGINNING WORK. THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND <br />ALL DAMAGES ARISING OUT OF THEIR FAILURE TO <br />EXACTLY LOCATE AND PROTECT ALL EXISTING UTILITY <br />FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST BE <br />PERFORMED IN ACCORDANCE WITH PSE AND SNOPUD <br />REQUIREMENTS. COORDINATE CONSTRUCTION <br />ACTIVITIES AND SCHEDULE WITH UTILITY OWNERS. <br />3.LIMITS OF STEEL PILES AND REINFORCED CONCRETE <br />FOUNDATIONS ARE SHOWN BASED ON BEST <br />AVAILABLE RECORD INFORMATION. EXISTING <br />FOUNDATION DEMOLITION SHALL BE PERFORMED AS <br />REQUIRED TO COMPLETE THE WORK. <br />4.PROVIDE TRENCH CUT OFF WALL WHERE <br />GROUNDWATER IS PRESENT PER DETAIL 2/CD-2608. <br />10 402020FEET0 <br />KEY MAP <br />SCALE: NTS <br />WEST MARINE VIEW DRIVE20TH STREETRUCKER AVEGRAND AVEKnow what's below. <br />before you dig.Call <br />R <br />24TH STREET <br />25TH STREETLOWER NORTONAVENUE (EAST)12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.