My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />30" CS 513.86LF @ 0.43%STA. 76+38.86IE = 6.6730" CS 53.43LF @ 0.00%18" SS ABANDSTA. 76+50.76IE=6.25±6" IPGSTA. 76+74.87TOP=12.6±12" HPGSTA. 76+77.06TOP=12.2±EX 30" CSEX 30" CSSTA. 76+92.28IE=6.67±EX 30" CS12" SSSTA. 75+26.25IE=6.48±18" SD CONCSTA. 76+55.43IE=4.80±POTHOLE30" CS 10.00LF @ 0.43%SSMH 20460" TYPE 3 MODIFIEDRIM=15.718" W DIPSTA. 76+69.24TOP=10.7±0.76'CLEAR74+80 75+00 <br />75+20 75+40 75+60 75+80 <br />76+00 <br />76+20 76+40 76+60 76+80 <br />77+00 <br />77+20 77+40 77+60 77+80 <br />78+00 <br />78+20 78+40 <br />78+60 <br />EXISTING GROUND <br />ACCESSWAY30x30x30 TEESTA. 76+28.86IE = 6.62TRENCH PER COE DETAIL 614 MOD <br />AND SECTION 31 23 00 <br />1CD-260112" SSSTA. 77+21.22IE=6.35±APPROX TRENCH <br />CUT-OFF WALL (TYP) <br />2 <br />CD-2608UNK TSTA. 75+32.32TOP=UNKNOWN91 <br />1 <br />6 <br />1 <br />5918 <br />418PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL219 <br />220 <br />221 <br />29051800210400 <br />615 MILLWRIGHT LOOP N <br />PL P L P L P L P L P L P L P L PL P L PL P L PL P L PL P L PL P L PL P L PL P L P L P L P L P L P L PL P L PL P L PL P L PL P L PL P L P L P L P L P L P L P L P L P L PL P L <br />PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLP75+0076+0077+0078+0078+56STA. 76+38.86 <br />N:366374.69, E:1302460.37 <br />Δ <br />30" CS <br />30" CS <br />2 <br />5 WEST MARINE VIEW DRIVE <br />POTHOLE APS PH 27 <br />GROUND WATER EL=15.5 <br />TOP OF 8" WATER PIPE=10.7 <br />POTHOLE APS PH 26 <br />GROUND NGAS EL=15.0 <br />TOP OF 12" NGAS PIPE=10.5 <br />TOP OF 6" NGAS PIPE=11.7 <br />EX 6" IPG <br />EX 12" HPG <br />EX 18" SD CONC <br />EX 8" W DIP <br />3 <br />7 <br />CO01 <br />CO02 <br />EX 8" SD CMP <br />21° 16' 02" HORIZ <br />F <br />CD-2610 <br />STA. 76+92.28 <br />N:366424.78, E:1302441.78 <br />Δ 22° 30' 00" HORIZ <br />PORT OF EVERETT <br />SSMH 204, TYPE 3 MODIFIED <br />STA. 76+28.86 <br />N:366364.69, E:1302460.21 <br />Δ 0° 00' 00" HORIZ <br />EX 30" CS <br />4 <br />1 <br />CD-2601 <br />GRAND AVENUE <br />PARK BRIDGE <br />14 <br />10 <br />14 <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2115.DWGPlot date 12/8/2025 10:52 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />1 PROVIDE SN72 PN50 FRP PIPE PER SECTION 33 05 36. <br />ALL JOINTS TO BE RESTRAINED WHERE SPECIFIED. <br />2 WORK SHALL PROTECT THE OVERHEAD GRAND <br />AVENUE PARK BRIDGE (GAPB) AND ASSOCIATED <br />UTILITIES. <br />3 REMOVE 8" SD WHERE WITHIN TRENCH LIMITS OF 30" <br />CS AND PLUG ENDS OF REMAINING 8" SD. ADJACENT <br />18" SD TO BE PROTECTED AND REMAIN IN SERVICE. <br />4 PROVIDE SHOP FABRICATED FRP FITTING PER SECTION <br />33 05 36. RESTRAIN JOINTS AS SPECIFIED. <br />5 EDGES OF EXISTING APPROXIMATELY 8 CY CONCRETE <br />THRUST BLOCK POURED ON TOP OF EXISTING 30" CS <br />PIPE MAY IMPACT WORK ZONE. CONTRACTOR SHALL <br />CHIP THROUGH EDGES OF THRUST BLOCK AS NEEDED. <br />IMPACT TO THRUST BLOCK SHALL BE MINIMIZED AND <br />COORDINATED WITH CITY'S REPRESENTATIVE. <br />6 CONNECT 30" FRP TO EX 30" C-905 PVC. REMOVE 30" <br />CAP AND THRUST BLOCK. FIELD VERIFY LOCATION <br />AND DEPTH. PROVIDE RESTRAINED PRESSURE RATING <br />COUPLING. SEE SECTION 33 05 31.13. <br />7 SEE SHEET C-2215 FOR CUT, REMOVAL AND PLUG OF <br />30" PVC. <br />9 REMOVE AND PLUG SEWER WITHIN TRENCH LIMITS. <br />SEWER TO BY BYPASSED OR ROUTED TO SEWER MH <br />AND CONNECTION AFTER INSTALLATION PER C-2214, <br />IF ACTIVE. <br />10 BYPASS EXISTING SANITARY SEWERS PER SECTION 33 <br />01 30.50 AS REQUIRED TO COMPLETE THE WORK. <br />14 GAS LINE TO BE RELOCATED BY PSE. CONFIRM <br />LOCATION OF RELOCATED GAS. <br />18 PROVIDE UTILITY SUPPORT PER DETAIL 1/CD-2608. <br />COMBINED SEWER <br />WMVD - 30" CS <br />PLAN AND PROFILE - STA 74+80 TO 78+60 <br />C-2115 <br />41 <br />B. O'NEILL <br />T. FRANKLIN <br />K. WEBER <br />PROFILE <br />SCALE: HORIZ: 1"=20' VERT:1"=5' <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> MATCHLINE STA 74+80SEE DRAWING C-3114GENERAL NOTES <br />KEY NOTES <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST <br />BE PERFORMED IN ACCORDANCE WITH PSE AND <br />SNOPUD REQUIREMENTS. COORDINATE <br />CONSTRUCTION ACTIVITIES AND SCHEDULE WITH <br />UTILITY OWNERS. <br />3.LIMITS OF STEEL PILES AND REINFORCED CONCRETE <br />FOUNDATIONS ARE SHOWN BASED ON BEST <br />AVAILABLE RECORD INFORMATION. EXISTING <br />FOUNDATION DEMOLITION SHALL BE PERFORMED <br />AS REQUIRED TO COMPLETE THE WORK. <br />4.PROVIDE TRENCH CUT OFF WALL WHERE <br />GROUNDWATER IS PRESENT PER DETAIL 2/CD-2608. <br />10 402020FEET0 <br />Know what's below. <br />before you dig.Call <br />R <br />KEY MAP <br />SCALE: NTS <br />WEST MARINE VIEW DRIVE20TH STREETRUCKER AVEGRAND AVE24TH STREET <br />25TH STREET <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.