My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />30 <br />35 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />30 <br />35 <br />36" CASING 140.73LF @ 1.00% <br />24" SS 162.23LF @ 0.41%16" W DIPSTA. 15+13.53TOP=22.2±6" HPGSTA. 15+18.33TOP=21.9±EXISTING GROUND <br />24" SS 320.70LF @ 0.41%COMMSTA. 15+24.09TOP=22.0±24" OUTSIDE DROP <br />BNSF RAILROAD ROW <br />12" SS CONCSTA. 16+50.15IE=UNKNOWNSTA. 15+47.15STA. 16+37.1536" IE=7.44STA. 16+58.9436" IE=8.85STA. 15+18.21STA. 16+56.42STA. 15+18.2124" IE = 9.30STA. 16+58.9424" IE = 7.88TYPICAL ASPHALT <br />PAVEMENT PER <br />DETAIL 1/CX-2011 <br />ASPHALT PAVEMENT W/ <br />MULTI LAYER GEOGRID <br />PER DETAIL 2/CX-2011 <br />STA. 17+45±14+00 <br />14+2014+4014+6014+80 <br />15+00 <br />15+2015+4015+6015+80 <br />16+00 <br />16+2016+4016+6016+80 <br />17+00 <br />17+2017+4017+60 <br />17+80 <br />24" SS 158.11LF @ 1.01% <br />TRENCH PER <br />DETAIL A/CD-2602 <br />TRENCHLESS INSTALLATION <br />PER DWG C-2801 <br />24" SS 8.49LF @ 0.41% <br />TRENCH PER DETAIL D/CD-2602 <br />WITH CLSM PER SECTION 31 23 00 <br />IE=17.41STA. 14+98.71APPROX TRENCH <br />CUT-OFF WALL (TYP)SSMH 10448" TYPE 1RIM=21.63IE = 7.87CONTRACTOR'S <br />RECEIVING PIT <br />STA. 15+07.20IE = 9.47SSMH 10348" TYPE 1RIM=25.57IE IN = 17.37 (E)IE OUT = 9.47 (W)CONTRACTOR'S <br />LAUNCH PIT <br />2 <br />CD-2608 <br />2 <br />2 <br />1 <br />3 44617 18PLPLPLPLPLPLPLPLPLPLEASEMENT AFN 201907310975PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL229 <br />50275 <br />MIC <br />35.06 <br />01102600000100 <br />1215 24TH ST <br />01102600000200 <br />1217 24TH ST <br />00437448500000UNKNOWN00437455701600UNKNOWN361LF CONC GUTTER TO CB714+0015+0016+0017+00 <br />SSMH 104, TYPE 1 <br />STA. 16+65.31 <br />N:362705.00, E:1302111.99 <br />Δ 24" SS212122 253526352426 <br />272222#7 <br />#6 <br />POTHOLE APS PH 15 <br />GROUND 16" WATER EL=25.4 <br />TOP OF WATER PIPE=22.2 <br />POTHOLE APS PH 16 <br />GROUND 6" GAS EL=25.3 <br />TOP OF 6" GAS PIPE=21.9 <br />POTHOLE APS PH 17 <br />GROUND COMM EL=25.0 <br />TOP OF COMM PIPE=22.0 <br />EX 16" W DIP <br />EX 6" HPGEX 12" SS CONC <br />ABANDONED <br />CO28 <br />CO28 <br />10.7'10.9'24TH ST <br />30' BNSF OFFSET <br />30' BNSF OFFSET <br />D <br />CD-2609 <br />30' BNSF OFFSET <br />LIMITS OF TRENCHLESS <br />INSTALLATION, TYP <br />BNSF RAILROAD ROWCO20 <br />CO19 <br />3 <br />E <br />CD-2609 <br />EX 32" SS PEP <br />IE=-57.0± <br />4 <br />145 <br />15 <br />7PORT OF EVERETTNORTON TERMINALSTA. 17+45± <br />SSMH 103, TYPE 1 <br />STA. 15+07.20 <br />N:362691.78, E:1302269.55 <br />Δ 0° 00' 00" HORIZ <br />64 <br />91° 44' 42" HORIZ <br />WMVD RETAINING <br />WALL <br />STA. 14+98.71 (PI) <br />N:362691.07, E:1302278.01 <br />Δ 87° 42' 34" HORIZ <br />MANHOLE <br />ENLARGED <br />PLANS <br />1 <br />CD-2612 <br />18 <br />17 <br />PE AREA 4 <br />TCE AREA 2 <br />TYPICAL ASPHALT PAVEMENT <br />PER DETAIL 1/CX-2011 <br />ASPHALT PAVEMENT W/ <br />MULTI LAYER GEOGRID <br />PER DETAIL 2/CX-2011 <br />WEST MARINE VIEW DRIVELOWER NORTON AVENUE (EAST)BUILDING OR STRUCTURE FOUNDED ON <br />STEEL H-PILES. <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2207.DWGPlot date 12/8/2025 11:44 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />SANITARY SEWER <br />WMVD - 24" SS <br />PLAN AND PROFILE - STA 14+00 TO 17+80 <br />C-2207 <br />43 <br />R. DAVIES <br />T. FRANKLIN <br />K. WEBER <br />PROFILE <br />SCALE: HORIZ: 1"=20' VERT:1"=5' <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> <br />MATCHLINE STA 17+80 <br />SEE DRAWING C-2208 <br />MATCHLINE STA 14 <br />+ <br />0 <br />0 <br />SEE DRAWING C-2 <br />2 <br />0 <br />6 <br />TRENCHLESS CROSSING 1 <br />C-2801 <br />GENERAL NOTES <br />KEY NOTES <br />LEGEND <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING WORK. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY <br />AND ALL DAMAGES ARISING OUT OF THEIR FAILURE <br />TO EXACTLY LOCATE AND PROTECT ALL EXISTING <br />UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST BE <br />PERFORMED IN ACCORDANCE WITH PSE AND SNOPUD <br />REQUIREMENTS. COORDINATE CONSTRUCTION <br />ACTIVITIES AND SCHEDULE WITH UTILITY OWNERS. <br />3.LIMITS OF REMAINING FOUNDATIONS ARE SHOWN <br />BASED ON BEST AVAILABLE RECORD INFORMATION. <br />EXISTING FOUNDATION DEMOLITION SHALL BE <br />PERFORMED AS REQUIRED TO COMPLETE THE WORK. <br />4.PROVIDE TRENCH CUT OFF WALL WHERE <br />GROUNDWATER IS PRESENT PER DETAIL 2/CD-2608. <br />1 PROVIDE SN46 PN25 FRP PIPE PER SECTION 33 05 36 OR <br />PVC GRAVITY SEWER PIPE PER SECTION 33 05 31.11. <br />2 PROVIDE SN72 PN25 FRP PIPE PER SECTION 33 05 36 OR <br />C900, DR18 PER SECTION 33 05 31.13. <br />3 DEMOLISH STEEL PILES AND REINFORCED CONCRETE <br />FOUNDATION AS REQUIRED TO COMPLETE THE WORK. <br />SEE SHEETS CX-2021 AND CX-2022. <br />4 PROVIDE 48” TYPE 1 MANHOLE PER COE STD DETAIL <br />605 WITH CAST IN PLACE BASE. <br />5 PROVIDE NOTIFICATION, EXCAVATION AND STANDBY <br />PER UTILITY OWNER REQUIREMENTS. <br />6 PROVIDE OUTSIDE DROP PER COE STD DETAIL 612 <br />7 ABANDON EXISTING PIPE IN PLACE. PRESSURE GROUT <br />PER SECTION 02 41 00. SEAL OUTLET IN DOWNSTREAM <br />MANHOLE. REMOVE INTERFERING PIPE AS REQUIRED <br />TO COMPLETE THE WORK. <br />14 GAS LINE TO BE RELOCATED BY PSE. CONFIRM <br />LOCATION OF RELOCATED GAS. <br />15 RELOCATE EX WATER LINE. MAINTAIN SERVICE DURING <br />CONSTRUCTION. <br />17 PROVIDE MANHOLE FOUNDATION PER DETAIL <br />6/CD-2601. OVEREXCAVATE EXISTING SUBGRADE <br />APPROX 3-FT TO COMPETENT MATERIAL. <br />18 PROVIDE SHOP FABRICATED FITTING, C900 OR FRP <br />MATCHING THE PROVIDED C028 PIPE. RESTRAIN ALL <br />PIPE AND FITTINGS. SUBMIT SHOP DRAWINGS FOR THE <br />DROP MANHOLE, BEND AND FITTINGS A MINIMUM OF <br />20 FT UPSTREAM AND DOWNSTREAM OF THE <br />HORIZONTAL BENDS TO MAKE THE RAIL CROSSING AND <br />AT THE CROSSING. <br />10 402020FEET0 <br />Know what's below. <br />before you dig.Call <br />R <br />KEY MAP <br />SCALE: NTS <br />WEST MARINE VIEW DRIVE20TH STREETRUCKER AVEGRAND AVE24TH STREET <br />25TH STREET <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.