My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
72 <br />-10 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />-10 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />22+80 23+00 23+20 23+40 23+60 23+80 24+00 24+20 24+40 24+60 24+80 25+00 25+20 25+40 25+60 25+80 26+00 26+20 26+40 26+60 26+80 27+00 27+20 27+40 27+60 27+80 28+00 28+10 <br />24" SS 146.17LF @ 0.41% <br />24" SS 321.74LF @ 0.41%12" SS CONCSTA. 27+16.85IE=6.59±EXISTING GROUND <br />1.94'CLEAR6" HPGSTA. 27+29.33IE=UNKNOWN24" SS 33.27LF @ 2.64%SSMH 10760" TYPE 3RIM=17.80IE = 3.7412" SS CONCSTA. 25+58.33IE=7.20±6" WSTA. 27+45.98IE=12.21±24" SS 94.03LF @ 0.41% <br />24" OUTSIDE DROP <br />WO UP3525 (BY OTHERS) <br />REMOVE END CAP AND <br />CONNECT TO EX 24" PIPE30" CSSTA. 27+00.44IE=-0.95SSMH 10660" TYPE 3RIM=18.24IE = 5.05TRENCH PER <br />DETAIL A/CD-2602 <br />TRENCH PER COE <br />DETAIL 614 MOD <br />SSMH 10860" TYPE 3RIM=16.62IE IN = 3.35 (S)IE OUT = -1.30 (W)APPROX TRENCH <br />CUT-OFF WALL (TYP) <br />2 <br />CD-2608 <br />2162 <br />6 <br />1811161619 <br />2PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL101102 <br />106 <br />112 <br />500 <br />29051900201500 <br />UNKNOWN <br />29051900201300 <br />2600 FEDERAL AVE <br />EASEMENT AFN 201907310975 <br />XXXXXXXXXXXXXX23+0024+0025+0026+0027+0028+00 <br />24" SS <br />24" SS <br />18 <br />17 <br />18 <br />19 <br />17 <br />18 <br />19 <br />20 <br />18 <br />19 <br />#14 #13 <br />POTHOLE APS PH 19 <br />GROUND COMM EL=17.9 <br />TOP OF COMM PIPE=14.9 <br />EX 12" SS CONC ABAND EX 12" SS CONC ABAND <br />EX 16" W DIP <br />EX 6" HPG SNOPUD TRANSMISSION <br />POLES AND ANCHORS <br />SEE GENERAL NOTE 2. <br />CO28 <br />7 <br />7 <br />7 <br />8 <br />SSMH 107, 60" TYPE 3 <br />STA. 26+74.69 <br />N:363702.43, E:1302265.13 <br />Δ <br />SSMH 108, 60" TYPE 3 <br />STA. 27+68.72 <br />N:363793.66, E:1302242.34 <br />Δ <br />STA. 28+01.98 <br />N:363794.54, E:1302209.08 <br />Δ <br />LOCATION SHOWN IS APPROX 5' <br />INSIDE PGSF SHEET PILE WALL <br />PROVIDE 24" SN72 PN25 FRP BETWEEN <br />SSMH 108 AND THE EX PGSF PIPE <br />74° 26' 56" HORIZ <br />CO20CO01 <br />11 <br />WO UP 3525 <br />(BY OTHERS) <br />AREA 15 <br />COMBINED SEWER INFLUENT <br />CSVT-30-01 <br />SWVT-40-01 <br />WO UP3525 (BY OTHERS) <br />TO CSMH-46-01 <br />24" FRP <br />G <br />CD-2609 <br />EX 32" SS PEP <br />IE = -56.0± <br />EX 32" SS PEP <br />IE = -52.7± <br />CSVT 10-02 <br />WATER METER VAULT <br />SSMH 106, 60" TYPE 3 <br />STA. 23+52.95 <br />N:363384.20, E:1302217.72 <br />Δ <br />10 <br />16 <br />10 <br />10 <br />16 16 <br />NORTON TERMINAL <br />PGSF <br />WO# UP-3523 <br />LOWER NORTON AVE <br />2° 46' 19" HORIZ <br />22° 30' 00" HORIZ <br />0° 00' 00" HORIZ <br />19TCE AREA 2 <br />PE AREA 5 <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2209.DWGPlot date 12/8/2025 10:54 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />10 402020FEET0 <br />SANITARY SEWER <br />LOWER NORTON AVE - 24" SS <br />PLAN AND PROFILE - STA 22+80 TO 28+00 <br />C-2209 <br />45 <br />R. DAVIES <br />T. FRANKLIN <br />K. WEBER <br />PROFILE <br />SCALE: HORIZ: 1"=20' VERT:1"=5' <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> MATCHLINE STA 22+80SEE DRAWING C-2208Know what's below. <br />before you dig.Call <br />R <br />GENERAL NOTES <br />KEY NOTES <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN HEREIN <br />ARE APPROXIMATE LOCATIONS ONLY BASED ON THE FIELD <br />LOCATION OF UTILITY LOCATE PAINT MARKS AND <br />PHYSICAL FEATURES VISIBLE ON OR ABOVE THE GROUND <br />SURFACE. THE CONTRACTOR SHALL DETERMINE THE <br />LOCATION OF ANY AND ALL UNDERGROUND UTILITIES <br />BEFORE BEGINNING WORK. THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR ANY AND ALL DAMAGES ARISING OUT <br />OF THEIR FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST BE <br />PERFORMED IN ACCORDANCE WITH PSE AND SNOPUD <br />REQUIREMENTS. COORDINATE CONSTRUCTION ACTIVITIES <br />AND SCHEDULE WITH UTILITY OWNERS. <br />3.LIMITS OF REMAINING FOUNDATIONS ARE SHOWN BASED <br />ON BEST AVAILABLE RECORD INFORMATION. EXISTING <br />FOUNDATION DEMOLITION SHALL BE PERFORMED AS <br />REQUIRED TO COMPLETE THE WORK. <br />4.PROVIDE TRENCH CUT OFF WALL WHERE GROUNDWATER <br />IS PRESENT PER DETAIL 2/CD-2608. <br />2 PROVIDE SN72 PN25 FRP PIPE PER SECTION 33 05 36 OR <br />C900, DR18 PER SECTION 33 05 31.13. <br />6 PROVIDE OUTSIDE DROP PER COE STD DETAIL 612. <br />7 ABANDON EXISTING PIPE IN PLACE. PRESSURE GROUT PER <br />SECTION 02 41 00. SEAL OUTLET IN DOWNSTREAM <br />MANHOLE. REMOVE INTERFERING PIPE AS REQUIRED TO <br />COMPLETE THE WORK. <br />8 PROTECT IN PLACE EX 31" TELECOM CABLE TRENCH. <br />10 BYPASS EXISTING SANITARY SEWERS PER SECTION 33 01 <br />30.50 AS REQUIRED TO COMPLETE THE WORK. <br />11 CONNECT TO PLANT PIPING. FIELD VERIFY LOCATION, <br />ELEVATION AND CONDITION OF CONNECTION POINT. <br />COORDINATE INSTALLATION AND SCHEDULE WITH CITY. <br />16 PROVIDE 60” TYPE 3 MANHOLE PER COE STD DETAIL 607 <br />WITH CAST IN PLACE BASE. MANHOLE TO BE SUPPORTED <br />ON PILES PER S-4006 AND SECTION 31 63 33. <br />18 PROVIDE UTILITY SUPPORT PER DETAIL 1/CD-2608. <br />19 SHEET PILE WALL BY WO# UP3525. LOCATE EXISTING <br />SHEET PILE WALL (APPROXIMATE LOCATION SHOWN) <br />REMOVE PORTIONS OF THE SHEET PILE WALL AS <br />REQUIRED TO CONNECT TO PGSF PIPE. <br />KEY MAP <br />SCALE: NTS <br />WEST MARINE VIEW DRIVE20TH STREETRUCKER AVEGRAND AVE24TH STREET <br />25TH STREET <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.