My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
60 <br />70 <br />80 <br />90 <br />100 <br />110 <br />120 <br />130 <br />140 <br />60 <br />70 <br />80 <br />90 <br />100 <br />110 <br />120 <br />130 <br />140 <br />31+60 31+80 32+00 32+20 32+40 32+60 32+80 33+00 33+20 33+40 33+60 33+80 34+00 34+20 34+40 34+60 34+80 35+00 35+20 35+40 35+60 35+80 36+00TRANSITION STRUCTURERIM=116.86IE IN = 105.90 (W)IE IN = 106.90 (W)IE OUT = 105.85 (E)36" SS 58.28LF @ 2.64% <br />36" SS (CIPP LINED) <br />EXISTING GROUNDSSMH 30160" TYPE 3RIM=118.68IE IN = 104.31 (W)IE OUT = 104.11 (E)EX 60" CASING <br />EX 30" SS DIP <br />18" FM ( <br />S <br />LI <br />P- <br />LI <br />N <br />E <br />D) <br />4 <br />7 <br />8. <br />7 <br />2 <br />L <br />F <br />@ <br />2 <br />2. <br />1 <br />7 <br />% <br />ACCESS PITEX TRANSITION STRUCTUREEX 30" IE IN = 104.32EX 12" IE IN = 105.37EX 36 IE OUT = 104.37RIM=116.5718" FM 8.18LF @ 19.38% <br />12" SS 8.19LF @ 18.88%12" IE=105.35STA. 32+90.55TOC <br />ELEV = 104.85 <br />18" IE=104.32STA. 32+90.5818" IE=105.90STA. 32+98.7612" IE=106.90STA. 32+98.74TRENCH PER <br />COE DETAIL 614 <br />TRENCHLESS <br />INSTALLATION <br />7 <br />5 <br />1 <br />1 6 <br />8 <br />206 <br />207 <br />208 <br />00822700010100 -30300 <br />1931 GRAND AVE <br />00437042600101 <br />1410 20TH ST <br />00437437601700 <br />1932 RUCKER AVE <br />00437037701500 <br />1931 RUCKER AVE <br />00437442701701 <br />2002 RUCKER AVE <br />00437042600102 <br />2001 RUCKER AVE00437442700101 <br />2001 GRAND AVE 00437442700102 <br />1310 20TH ST <br />00437037701701 <br />1411 20TH ST <br />00437042603101 <br />1412 20TH ST <br />FMFM32+0033+0034+0035+0036+0018" FM (SLIP-LINED)36" SS <br />20TH STREETRUCKER AVENUESSMH 301, TYPE 3 <br />STA. 33+64.01 <br />N:364576.72, E:1303013.76 <br />TEMPORARY BYPASS1 <br />CD-2605 <br />2 <br />CO03 <br />EX 12" SS DIP FM <br />6 <br />3 <br />607 <br />G <br />CD-2610 <br />TRANSITION STRUCTURE <br />STA. 33+05.54 <br />N:364572.22, E:1302947.38 <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2213.DWGPlot date 12/8/2025 10:57 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />1 PROVIDE DR17 HDPE SLIP LINER PER SECTION 33 31 <br />20.23. SLIP LINE EXISTING 30" DIP INSIDE EXISTING <br />60" STEEL CASING. <br />2 SLIP LINE ACCESS PIT. APPROX 60 FT X 10 FT. <br />DEWATER AND REMOVE DEBRIS FROM EXISTING 30" <br />DIP PRIOR TO SLIP LINING. SLIP LINE 18" SS INTO <br />EXISTING 30" DIP PER SECTION 33 31 20.23. FILL <br />ANNULAR SPACE OF 30" DIP WITH GROUT. <br />3 BYPASS 12" SEWER. COORDINATE SEWER <br />CONNECTION TO OCCUR DURING COORDINATED <br />SHUT-DOWN. SEE SECTION 33 01 30.50. <br />5 PROVIDE DIP PIPE PER SECTION 33 05 31 AT EXISTING <br />SLOPE TO MEET INVERT AT NEW WALL. CONNECT 12" <br />DIP AT 45 DEGREE JOINT TO MAINTAIN HORIZONTAL <br />ALIGNMENT. <br />6 PROVIDE SN46 PN25 FRP PIPE PER SECTION 33 05 36. <br />TRENCH PER COE DETAIL 614 AND SECTION 31 23 00. <br />7 DEMOLISH EXISTING STRUCTURE, SEE DRAWING <br />CD-2604. <br />8 DEMOLISH EXISTING 36" CIPP LINED RCP AS <br />REQUIRED TO COMPLETE THE WORK. DEMOLISH RCP <br />PIPE AND CIPP LINER PER SECTION 02 41 00. <br />SEWER FORCE MAIN <br />20TH STREET - 18" SS <br />PLAN AND PROFILE - STA 31+60 TO 36+00 <br />C-2213 <br />49 <br />B. O'NEILL <br />T. FRANKLIN <br />K. WEBER <br />PROFILE <br />SCALE: HORIZ: 1"=20' VERT:1"=10' <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY <br /> MATCHLINE 31+60SEE SHEET C-2212GENERAL NOTES <br />KEY NOTES <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.SEE GENERAL NOTES FOR ADDITIONAL <br />INFORMATION. <br />3.SHORT TERM CLOSURE OF RUCKER AVE IS <br />ALLOWABLE DURING HDPE PULL-THROUGH TO <br />LIMIT NUMBER OF PIPE FUSIONS. <br />10 402020FEET0 <br />Know what's below. <br />before you dig.Call <br />R <br />KEY MAP <br />SCALE: NTS <br />WEST MARINE VIEW DRIVE20TH STREETRUCKER AVEGRAND AVE24TH STREET <br />25TH STREET <br />1.METHOD OF INSTALLATION SLIPLINING. <br />2.ANGLE OF CROSSING: 80 DEGREES. <br />3.CASING PIPE: EXISTING 30" DUCTILE IRON PIPE. <br />4.CARRIER PIPE: 18" HDPE DR17 WITH FUSION <br />WELDED JOINTS. <br />5.ACTUAL WORKING PRESSURE OF UTILITY PIPE: 53 <br />PSI UNDER TYPICAL CONDITION. <br />BNSF PERMITTING NOTES <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.