My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
-10 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />30 <br />-10 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />30 <br />30+40 30+60 30+80 31+00 31+20 31+40 31+60 31+80 32+00 32+20 32+40 32+60 32+80 33+00 33+20 33+40 33+60 33+80 34+00 34+20 34+40 34+60 34+80 35+00 35+20 35+40 <br />48" SD 379.47LF @ 0.41%STA. 30+87.79IE = 6.9748" SD 163.13LF @ 0.48%12" WSTA. 34+04.94IE=UNKNOWN6" HPGSTA. 34+52.94IE=UNKNOWN16" W DIPSTA. 34+56.18TOP=16.3±48" SD 156.58LF @ 0.41%STA. 34+67.26IE = 5.42EXISTING GROUND <br />10" W CISTA. 33+68.58IE=UNKNOWNSTA. 34+35.48TYPICAL ASPHALT <br />PAVEMENT PER <br />DETAIL 1/CX-2011 <br />ASPHALT PAVEMENT W/ <br />MULTI LAYER GEOGRID <br />PER DETAIL 2/CX-2011 <br />STA. 34+42±TRENCH PER <br />DETAIL A/CD-2602 <br />2 <br />CD-2608 <br />APPROX TRENCH <br />CUT-OFF WALL (TYP) <br />1 1 <br />1 <br />3 <br />44PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL405 <br />406 <br />29051900201000 <br />UNKNOWN <br />29051900200900 <br />UNKNOWN 29051900201100 UNKNOWNEASEMENT AFN 201907310975 XXXXXXXXXXXXXXXX31+0032+0033+0034+0035+00STA. 30+87.79 <br />N:362867.25, E:1302123.54 <br />Δ <br />STA. 34+67.26 <br />N:363241.97, E:1302183.33 <br />Δ <br />48" SD 48" SD <br />48" SD21 <br />20 20 <br />21 <br />22 <br />1 <br />9 <br />POTHOLE APS PH 18 <br />GROUND 16" WATER EL=19.1 <br />TOP OF 16" WATER PIPE=16.3 <br />EX 16" W DIP <br />EX 10" W CI <br />EX 12" W <br />EX 12" SS CONC <br />2° 12' 01" HORIZ <br />2° 10' 51" HORIZ <br />F <br />CD-2609 <br />CO28 <br />CO20 <br />CO19 <br />EX 32" SS PEP <br />IE=-58.4± <br />7 <br />TYPICAL ASPHALT PAVEMENT <br />PER DETAIL 1/CX-2011 <br />ASPHALT PAVEMENT W/ MULTI LAYER <br />GEOGRID PER DETAIL 2/CX-2011 <br />STA. 34+42±4 <br />4 <br />3 <br />PORT OF EVERETT <br />NORTON TERMINAL <br />TCE AREA 2 <br />TCE AREA 3 <br />PE AREA 4 <br />LOWER NORTON AVENUE <br />BUILDING OR STRUCTURE FOUNDED ON <br />STEEL H-PILES. <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2308.DWGPlot date 12/8/2025 11:00 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />STORM DRAINAGE <br />LOWER NORTON AVE - 48" SD <br />PLAN AND PROFILE - STA 30+40 TO 35+40 <br />C-2308 <br />54 <br />R. DAVIES <br />T. FRANKLIN <br />K. WEBER <br />PROFILE <br />SCALE: HORIZ: 1"=20' VERT:1"=5' <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> MATCHLINE STA 30+40SEE DRAWING C-2307MATCHLINE STA 35+40SEE DRAWING C-2309GENERAL NOTES <br />KEY NOTES <br />LEGEND <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST <br />BE PERFORMED IN ACCORDANCE WITH PSE AND <br />SNOPUD REQUIREMENTS. COORDINATE <br />CONSTRUCTION ACTIVITIES AND SCHEDULE WITH <br />UTILITY OWNER'S. SEE SECTION 02 01 10 AND <br />SECTION 02 01 20. <br />3.LIMITS OF REMAINING FOUNDATIONS ARE SHOWN <br />BASED ON BEST AVAILABLE RECORD INFORMATION. <br />EXISTING FOUNDATION DEMOLITION SHALL BE <br />PERFORMED AS REQUIRED TO COMPLETE THE <br />WORK. <br />4.PROVIDE TRENCH CUT OFF WALL WHERE <br />GROUNDWATER IS PRESENT PER DETAIL 2/CD2608. <br />1 PROVIDE SN72 PN50 FRP PIPE PER SECTION 33 05 36. <br />ALL JOINTS TO BE RESTRAINED WHERE SPECIFIED. <br />3 DEMOLISH STEEL PILES AND REINFORCED CONCRETE <br />FOUNDATION AS REQUIRED TO COMPLETE THE <br />WORK. SEE SHEETS CX-2021 AND CX-2022. <br />4 PROVIDE SHOP FABRICATED FRP FITTING PER <br />SECTION 33 05 36. RESTRAIN JOINTS AS SPECIFIED. <br />7 ABANDON EXISTING PIPE IN PLACE. REMOVE <br />INTERFERING PIPE AS REQUIRED TO COMPLETE THE <br />WORK. REMOVE EX MH IN THEIR ENTIRETY. <br />10 402020FEET0 <br />Know what's below. <br />before you dig.Call <br />R <br />KEY MAP <br />SCALE: NTS <br />WEST MARINE VIEW DRIVE20TH STREETRUCKER AVEGRAND AVE24TH STREET <br />25TH STREET <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.