My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />50+00 50+20 50+40 50+60 50+80 51+004" NGASSTA. 50+10.77IE=10.83±12" SD PVCSTA. 50+18.25IE=11.10±1.27' <br />CLEAR <br />36" SDSTA. 50+07.14IE=6.67TOC ELEV = 6.22 <br />FACE OF GAPB WEST ABUTMENT <br />EX 30" CSSTA. 50+02.20IE=6.67±EXP JOINTSTA. 50+51.0336" DOUBLE BALL <br />JOINT FITTING2" P, 4" TSTA. 50+27.01IE=UNKNOWN36" SD 36.85LF <br />@ 0.60% <br />36" SD 7.11LF <br />@ 0.00% <br />EXISTING GROUND <br />90° VERT BENDSTA. 50+65.41IE=6.89STA. 50+43.936 <br />6 18PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL219 <br />220 <br />221 <br />29051800210400 <br />615 MILLWRIGHT LOOP N <br />PL P L PL P L PL P L PL P L PL PL P L PL P L PL P L PL P L PL P L PL P L P L PL P L PL P L PL P L PL P L PL P L PL P L P L PL P L PL P L PL P L P L P L PL P L P L PL <br />PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLP47+3145+0046+0047+005 <br />48" SD <br />WEST MARINE VIEW DRIVEPOTHOLE APS PH 27 <br />GROUND WATER EL=15.5 <br />TOP OF 8" WATER PIPE=10.7 <br />POTHOLE APS PH 26 <br />GROUND NGAS EL=15.0 <br />TOP OF 12" NGAS PIPE=10.5 <br />TOP OF 6" NGAS PIPE=11.7 <br />EX 6" IPG <br />EX 12" HPG <br />EX 18" SD CONC EX 8" W DIP <br />2 <br />EX 18" SS ABANDPOTHOLE APS PH EDGE OF <br />VAULT IS EDGE OF RIM <br />7 <br />3 <br />90° MJ BEND <br />N:366485.40 <br />E:1302402.29 <br />CO02 <br />CO01 <br />4 <br />F <br />CD-2610 <br />SD CLEANOUT <br />STA. 46+04.94 <br />N:366374.52, E:1302437.07 <br />Δ 0° 00' 00" HORIZ <br />16 <br />15 <br />16 <br />90° FLG BEND <br />N:366467.92 <br />E:1302406.38 <br />850+7950+0055+0055+54SEE PROFILE 2 - BELOW <br />SEE PROFILE 1 - BELOW <br />910 <br />EX 8" W DIP <br />EX 4" DRAIN <br />EX 2" P <br />EX 4" T <br />EX 8" W DIP <br />EX 2" W HDPE <br />PORT OF EVERETT <br />2 <br />13 <br />11 <br />EX 36" SD 12 <br />12 GRAND AVENUE <br />PARK BRIDGE <br />14 <br />14 <br />STORM-200 PROFILE <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />44+40 44+60 44+80 45+00 45+20 45+40 45+60 45+80 46+00 46+20 46+40 46+60 46+80 47+00 47+20 47+40 <br />48" SD 334.29LF @ 0.10% <br />48" SD 10.00LF @ 0.71%SD CLEANOUTRIM=15.346" IPGSTA. 46+39.98TOP=12.6±8" W DIPSTA. 46+34.12TOP=10.7±18" SS ABANDSTA. 46+16.26IE=6.25±12" HPGSTA. 46+41.87TOP=12.2±EXISTING GROUND <br />12" SSSTA. 44+93.33IE=6.64±1.23'CLEARSTA. 46+93.29IE = 6.6736" SD 6.60LF @ 0.01%STA. 47+01.29IE = 6.6736" SDSTA. 46+97.82IE=6.6736" SDSTA. 47+14.63IE=6.6736" SD 17.50LF <br />CLEANOUT 36" TEE <br />AND VALVE <br />ASSEMBLY <br />GRAND AVENUE <br />PARK BRIDGE <br />1.01'CLEARSTA. 46+86.69IE = 6.67STA. 47+10.63IE = 6.672 <br />CD-2607 <br />36" SD 22.76LF @ 0.71%STA. 46+14.94IE = 1.2636" SD 7.76LF @ 0.71%IE=2.01STA. 46+50.466CD-260748" TO 36" REDUCER <br />TRENCH PER DETAIL B/CD-2602 <br />AND SECTION 31 23 00 <br />STA. 47+18.63IE = 6.672 <br />CD-2608 <br />APPROX TRENCH <br />CUT-OFF WALL (TYP)UNK TSTA. 44+99.68TOP=UNKNOWN118 <br />6 <br />1 <br />1 <br />6 <br />STORM-200-CONN-2 PROFILE <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />55+00 55+20 55+40 55+60 55+80 <br />36" SD 17.95LF <br />@ 0.69%36" SDSTA. 55+07.04IE=6.67EX 30" CSSTA. 55+02.18IE=6.67±TOC ELEV = 6.22 <br />EXISTING GROUND <br />FACE OF GAPB WEST ABUTMENT <br />36" DOUBLE BALL <br />JOINT FITTING12" SD PVCSTA. 55+17.93IE=11.11±4" NGASSTA. 55+10.43IE=10.83±2" P, 4" TSTA. 55+27.11IE=UNKNOWN1.28' <br />CLEAR <br />IE=6.79STA. 55+24.8290° MJ BENDSTA. 55+39.2490° VERT BENDSTA. 55+43.99186 <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2315.DWGPlot date 12/8/2025 11:20 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />1 PROVIDE SN72 PN50 FRP PIPE PER SECTION 33 05 36. <br />ALL JOINTS TO BE RESTRAINED WHERE SPECIFIED. <br />2 DIRECT BURIED 36" RESILIENT WEDGE GATE VALVE <br />WITH MANUAL ACTUATOR, 2" SQUARE NUT IN VALVE <br />BOX AT GRADE. SEE SECTION 40 05 61-09. <br />3 CUT AND REMOVE APPROX 15 LF OF 36" C-905 PVC. <br />CONNECT DI TEE AND VALVE ASSEMBLY TO C-905 WITH <br />SLIP COUPLING JOINT RESTRAINT HARNESS. <br />4 CONNECT 36" FRP TO 36" DUCTILE IRON. BYPASS <br />STORM FLOWS DURING CONNECTION. LOCATE AND <br />REMOVE DI CAP. <br />5 WORK SHALL PROTECT THE OVERHEAD GRAND <br />AVENUE PEDESTRIAN BRIDGE (GABP) AND ASSOCIATED <br />UTILITIES. <br />6 PROVIDE DIP PIPE PER SECTION 33 05 31. <br />7 VERTICAL PIPES ANCHORED TO BRIDGE SUPPORT <br />STRUCTURE. SEE STAND PIPE DETAILS SHEET CD-2607. <br />8 REMOVE AND REPLACE CATCH BASIN, IF NECESSARY. <br />PROVIDE STORMWATER BYPASSING. <br />9 THRUST BLOCK - SEE DETAIL 4 AND 5/CD-2607. <br />10 FLEX-TEND EXPANSION JOINT. WRAP FITTING IN <br />MANUFACTURER-SUPPLIED POLY SLEEVE AND BACKFILL <br />WITH PEA GRAVEL TO ONE FOOT BEYOND THE FITTING <br />CONNECTING FLANGES. <br />11 REMOVE ALL IRRIGATION APPURTENANCES. TRASH <br />CAN AND LIGHT POLE TO BE RELOCATED. SEE <br />RESTORATION PLAN C-2405. <br />12 PROVIDE BYPASS PUMPING PER SECTION 33 01 30.50 <br />AS REQUIRED TO COMPLETE THE WORK. <br />13 REMOVE AND PLUG 18" ABANDONED SEWER WITHIN <br />TRENCH LIMITS. PLUGS SHALL BE CLASS B CONCRETE <br />AND MINIMUM ONE- DIAMETER IN LENGTH INTO <br />REMAINING PIPE. ENCASE END OF PIPE. <br />14 GAS LINE TO BE RELOCATED BY PSE. CONFIRM <br />LOCATION OF RELOCATED GAS. <br />18 PROVIDE UTILITY SUPPORT PER DETAIL 1\CD-2608. <br />STORM DRAINAGE <br />WMVD - 48" SD <br />PLAN AND PROFILE - STA 44+40 TO 47+40 <br />C-2315 <br />61 <br />B. O'NEILL <br />T. FRANKLIN <br />K. WEBER <br />PROFILE <br />SCALE: HORIZ: 1"=20' VERT:1"=5' <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> MATCHLINE STA 44+40SEE DRAWING C-2314GENERAL NOTES <br />KEY NOTES <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.SEE GENERAL NOTES FOR ADDITIONAL <br />INFORMATION. <br />PROFILE 1 <br />SCALE: HORIZ: 1"=20' VERT:1"=5' <br />PROFILE 2 <br />SCALE: HORIZ: 1"=20' VERT:1"=5' <br />10 402020FEET0 <br />Know what's below. <br />before you dig.Call <br />R <br />KEY MAP <br />SCALE: NTS <br />WEST MARINE VIEW DRIVE20TH STREETRUCKER AVEGRAND AVE24TH STREET <br />25TH STREET <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.