My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
-15 <br />-10 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />-15 <br />-10 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 2+00 <br />24" SS 33.61LF @ 0.33%24" SSSTA. 1+86.38IE=3.83±HDPE FRP30"X24" TEESTA. 49+19.49STA. 1+66.14IE = -2.0748" SDSTA. 1+81.40IE=3.59±6" HPGSTA. 1+66.45IE=13.16±6" WSTA. 1+58.01IE=11.75±EXISTING GROUND <br />WO# UP3525 <br />(BY OTHERS) <br />24" SP (1/4"THK) W/ <br />W257B SETTELEMENT <br />JOINT <br />STA. 1+71.44IE = -1.4224" SS 5.30LF @ 12.32%IE=-2.18END WO UP3815-02EX 24" BLIND FLANGESTA. 49+15.508" PVCSTA. 1+18.87IE=9.5416" CSSTA. 1+07.99IE=9.61±TO CSVT 30-01 34125 <br />5 <br />6 290519002013002600 FEDERAL AVE7+002+00 2+16.47 <br />1+00 2+00STA. 1+32.53 <br />N:363684.33, E:1302208.21 <br />STA. 1+66.14 <br />N:363683.24, E:1302241.81 <br />Δ <br />STA. 1+76.32= <br />STA. 49+19.52 <br />N:363681.67, E:1302251.86 <br />WO UP 3525 (BY OTHERS) <br />24" SP (1/4" THK) W/ W257B <br />SETTLEMENT JOINT <br />30" CS7° 05' 47" HORIZ <br />24" SS <br />3 <br />1 2 <br />4 <br />CSVT 30-01 <br />6 <br />CO01 <br />CO20 <br />CO28 <br />-10 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />-10 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />4+60 4+70 4+80 4+90 5+00 5+10 5+20 5+30 5+40 5+50 <br />48" <br />S <br />S <br /> <br />1 <br />5 <br />. <br />1 <br />0 <br />L <br />F <br />@ 1 <br />9 <br />. <br />8 <br />8 <br />%48" TEESTA. 5+27.14=STA. 46+96.37IE = 4.5516" CSSTA. 4+79.18IE=12.9648" SDSTA. 5+32.88IE=4.50±48" SS 10.10LF @ 0.18%STA. 46+96.37IE = 7.55EXISTING GROUND <br />WO# UP3525 <br />(BY OTHERS) <br />48" SP W/ <br />W257B SETTLEMENT <br />JOINT <br />IE=7.56END WO UP3815-02EX 48" BLIND FLANGESTA. 5+01.94SP FRP <br />3 3123PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL1+00 5+00STA. 5+27.14= <br />STA. 46+97.73 <br />N:363461.13, E:1302218.00 <br />WO UP3525 (BY OTHERS) <br />48" HDPE (IPS) DR17 AND <br />SETTLEMENT JOINT 30" SS48" SS <br />3 <br />SNOPUD TRANSMISSION <br />POLES AND ANCHORS <br />SEE GENERAL NOTE 2 <br />STA. 5+01.94 <br />N:363464.96, E:1302193.08 <br />1 2 <br />CO19 <br />CO01 <br />CO20 <br />CO28 <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2351.DWGPlot date 12/8/2025 12:21 PM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />COMBINED SEWER <br />PGSF CONNECTION EXPANDED VIEWS-1 <br />C-2351 <br />63 <br />J. RIEGAL <br />B. HAWES <br />J. RIEGEL <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY <br />44572 <br /> <br />ENLARGED PLAN AND PROFILE <br />SCALE: HORIZ: 1"=10' VERT: 1"=5' <br />1 <br />C-2109 <br />ENLARGED PLAN AND PROFILE <br />SCALE: HORIZ: 1"=10' VERT: 1"=5' <br />2 <br />C-2109 <br />GENERAL NOTES <br />KEY NOTES <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST <br />BE PERFORMED IN ACCORDANCE WITH PSE AND <br />SNOPUD REQUIREMENTS. COORDINATE <br />CONSTRUCTION ACTIVITIES AND SCHEDULE WITH <br />UTILITY OWNER'S. SEE SECTION 02 01 10 AND <br />SECTION 02 01 20. <br />1 CONNECT TO PLANT PIPING, FIELD VERIFY LOCATION, <br />ELEVATION AND CONDITION OF CONNECTION POINT <br />AND LOCATION OF TEE REQUIRED. COORDINATE <br />INSTALLATION AND SCHEDULE WITH CITY. <br />2 REMOVE BLIND FLANGE AND CONNECT TO EX <br />PIPING. SUBMIT SHOP DRAWINGS FOR THE <br />CONNECTION TO THE EX PIPE, SETTLEMENT <br />COUPLING, AND TRANSITION FROM STEEL OR HDPE <br />TO FRP AS SPECIFIED. <br />3 PROVIDE SN72 PN50 FRP TEE, SHOP FABRICATED <br />FITTING, REDUCER, FLANGE, AND PIPE PER SECTION <br />33 05 36. ALL JOINTS TO BE RESTRAINED AS <br />SPECIFIED. <br />4 PROVIDE BURIED FLG/FLG CONNECTION AND <br />MATERIAL TRANSITION HDPE TO FRP. <br />5 PROVIDE IPS DR17 HDPE PIPE AND FITTINGS PER <br />SECTION 33 05 33.23. <br />6 SHEET PILE WALL BY WO# UP3525. LOCATE EXISTING <br />SHEET PILE WALL (APPROXIMATE LOCATION <br />SHOWN) REMOVE PORTIONS OF THE SHEET PILE <br />WALL AS REQUIRED TO CONNECT TO PGSF PIPE. <br />10 402020FEET0 <br />Know what's below. <br />before you dig.Call <br />R <br />2.5 1055FEET0 <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.