My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL101102 <br />106 <br />112 <br />500 <br />29051900201500 <br />UNKNOWN <br />29051900201300 <br />2600 FEDERAL AVE <br />EASEMENT AFN 201907310975 <br />XXXXXXXXXXXXXXSAWCT SAWCTSAWCTSAWCTSAWCTSAWCTSAWC <br />T SAWCTSAWCT <br />SAWCT <br />SAWCT SAWCT SAWCT SAWCT <br />LOWER NORTON AVE <br />SAWCUT, TYP <br />ROADWAY STRIPING PER <br />EVERETT STD PLAN 720, TYP <br />3 1,164 SY <br />3 6 SY <br />3 17 SY <br />3 99 SYPORT OF EVERETT <br />NORTON TERMINAL <br />SEE G-2014, G-2015, AND <br />G-2016 FOR ADDITIONAL <br />RESTORATION REQUIREMENTS <br />AT NORTON TERMINAL <br />EDGE OF ASPHALT <br />PORT GARDNER <br />STORAGE FACILITY PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL405 <br />406 <br />29051900201000 <br />UNKNOWN <br />29051900200900 <br />UNKNOWN 29051900201100 UNKNOWNEASEMENT AFN 201907310975 XXXXXXXXXXXXXXXSAWCT SAWCT <br />SAWCT SAWCT SAWCT SAWCT SAWCT SAWCT SAWCT SAWCT <br />SAWCT <br />SAWCT <br />SAWCUT, TYP <br />ROADWAY STRIPING PER <br />EVERETT STD PLAN 720, TYP <br />3 <br />5 <br />PORT OF EVERETT <br />NORTON TERMINAL <br />223 SY <br />NORTON TERMINAL <br />ASPHALT PAVEMENT WITH <br />MULTI-LAYER GEOGRID <br />1,422 SY <br />4NORTON TERMINAL <br />ASPHALT PAVEMENT <br />89 SY <br />7 EDGE OF NORTON <br />TERMINAL PAVEMENT <br />SEE G-2014, G-2015, AND <br />G-2016 FOR ADDITIONAL <br />RESTORATION REQUIREMENTS <br />AT NORTON TERMINAL <br />EDGE OF ASPHALT <br />PAVEMENT <br />REMOVE AND REPLACE EX <br />CONCRETE CURB AS REQUIRED <br />TO COMPLETE THE WORK <br />PROTECT EX POWER POLES <br />AND IMPROVEMENTS IN PLACE <br />SAWCT SAWCUT <br />APPROX EXTENT OF CONCRETE PANELS <br />APPROX EXTENT OF OVERLAY <br />SIDEWALK, CURB AND GUTTER <br />HMA PAVEMENT, FULL DEPTH <br />2" MILL AND HMA PAVEMENT <br />PLANTING RESTORATION IN KIND <br />SURFACE RESTORATION IN KIND <br />PARTIAL CONCRETE PANEL REPLACEMENT <br />3/4" CRUSHED GRAVEL ROCK <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2402.DWGPlot date 12/8/2025 1:00 PM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />10 402020FEET0 <br />PAVEMENT RESTORATION <br />LOWER NORTON AVE PLAN <br />C-2402 <br />67 <br />R. DAVIES <br />T. FRANKLIN <br />K. WEBER <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> <br />Know what's below. <br />before you dig.Call <br />RMATCHLINESEE SHEET C-2401MATCHLINETHIS SHEET BELOW LEFTMATCHLINETHIS SHEET ABOVE RIGHTPLAN <br />SCALE: 1"=20"MATCHLINESEE SHEET C-24031.THE EXISTING UNDERGROUND UTILITIES SHOWN HEREIN ARE <br />APPROXIMATE LOCATIONS ONLY BASED ON THE FIELD LOCATION <br />OF UTILITY LOCATE PAINT MARKS AND PHYSICAL FEATURES <br />VISIBLE ON OR ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING WORK. THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL <br />DAMAGES ARISING OUT OF THEIR FAILURE TO EXACTLY LOCATE <br />AND PROTECT ALL EXISTING UTILITY FACILITIES. <br />2.REMOVE AND REPLACE CONCRETE AND ASPHALT CEMENT (AC) <br />PAVEMENT AS SPECIFIED. RESTORATION OF IMPROVEMENTS <br />SHALL BE IN ACCORDANCE WITH THE AGENCY WITH <br />JURISDICTION OVER THE RIGHT-OF-WAY (AGENCY) INCLUDING <br />THE CITY OF EVERETT AND WSDOT. <br />3.IF ADDITIONAL PAVEMENT IS CUT OR DAMAGED DURING <br />CONSTRUCTION, IT SHALL BE REMOVED AND REPLACED AS <br />REQUIRED BY AGENCY REQUIREMENTS AT NO ADDITIONAL COST <br />TO THE OWNER. <br />4.CONTRACTOR SHALL FIELD VERIFY AND RESTORE OR REPLACE ALL <br />EXISTING SIGNAGE, STRIPING, MARKINGS, TRAFFIC SIGNALS, <br />LOOP DETECTORS AND CONDUIT, MONUMENTS, STREET <br />IMPROVEMENTS (CURB, GUTTER, CURB RAMPS, ETC), <br />LANDSCAPING, SOD, UTILITY SURFACE FEATURES, AND OTHER <br />FACILITIES TO THE AGENCY REQUIREMENTS. <br />5.CONTRACTOR MUST PERFORM A PRE-CONSTRUCTION SURVEY <br />OF THE EXISTING CONDITIONS AND RESTORE TO <br />PRE-CONSTRUCTION LOCATIONS. <br />6.PAVEMENT REPLACEMENT FOR BYPASS OPERATIONS NOT <br />SHOWN. CONTRACTOR SHALL INCLUDE ADDITIONAL PAVEMENT <br />REPLACEMENT FOR BYPASS ROUTING IN THEIR BID PRICE. <br />7.CONTRACTOR TO COORDINATE ALL RESURFACING WITH AGENCY <br />REQUIREMENTS AND COMPLY WITH ENCROACHMENT PERMIT <br />REQUIREMENTS. MINIMUM LIMITS OF MILLING INCLUDES ALL <br />IMPACTED SURFACES TO LANE LINES OR CURB IF WITHIN 5-FT OR <br />AS REQUIRED BY AGENCY. FOR TRANSVERSE TRENCH CUTS, <br />MINIMUM MILLING REQUIREMENT IS 20-FT FROM TRENCH CUT <br />BOTH DIRECTIONS UNLESS OTHERWISE SHOWN. <br />GENERAL NOTES <br />KEY NOTES <br />LEGEND <br />1 RESTORE CONCRETE PANELS PER WSDOT A-40.10.10-04. <br />MATCH EXISTING SPECIAL BALLAST IN KIND. <br />2 RESTORE AC PAVEMENT PER WSDOT. MIN THICKNESS TO <br />MATCH EXISTING. <br />3 RESTORE AC PAVEMENT PER COE DETAIL 326. MIN <br />THICKNESS TO MATCH EXISTING. <br />4 RESTORE NORTON TERMINAL AC PAVEMENT PER DETAIL <br />1/CX-2011. SEE ADDITIONAL INFORMATION ON CX-2011 AND <br />CX-2012. MIN THICKNESS TO MATCH EXISTING. <br />5 RESTORE NORTON TERMINAL AC PAVEMENT AND <br />GEOTEXTILE PER DETAIL 2/CX-2011. SEE ADDITIONAL <br />INFORMATION ON CX-2011 AND CX-2012. MIN THICKNESS TO <br />MATCH EXISTING. PROVIDE EXISTING AGGREGATE BASE PLUS <br />6-INCHES. <br />7 RESTORE 12-INCH WIDE YELLOW STRIP SET 4-FT OFF EDGE OF <br />PAVEMENT MARKINGS, APPURTENANCES. <br />FULL DEPTH <br />REPLACEMENT <br />(8" HMA) <br />FULL DEPTH <br />REPLACEMENT <br />(NO EX <br />GEOGRID) <br />FULL DEPTH <br />REPLACEMENT <br />(MULTILAYER <br />GEOGRID) <br />MILL AND <br />OVERLAY <br />LOWER NORTON AVE 1,387 SY 738 SY <br />PORT OF EVERETT 89 SY 1,422 SY 660 SY <br />* FULL DEPTH LIMITS REPRESENT PARTIAL CONCRETE PANEL REPLACEMENT AREA BASED ON MINIMUM TRENCH <br />WIDTH AND SECTION CUT REQUIREMENTS <br />** ADDITIONAL AREA FOR MILL AND OVER LAY BASED ON LIMITS SHOWN IN ADDITION TO THE FULL DEPTH AREA <br />SHOWN. SEE G-2014 FOR AREA WITHIN NORTON TERMINAL <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.