My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
217 <br />223 <br />29051800301200 <br />W MARINE VIEW DR <br />29051800301100 <br />UNKNOWN <br />SAWCT <br />SAWCT <br />SAWCT <br />SAWCT SAWCT SAWCT SAWCT SAWCT SAWCT <br />SAWCT <br />SAWCTSAWCTSAWCTSAWCTSAWCT <br />SAWCT <br />SAWCT <br />WEST MARINE VIEW DRIVE 18TH STCEMENT CONCRETE <br />REPLACEMENT CURB <br />PER EVERETT STD PLAN <br />346 AND 343, TYP <br />ROADWAY STRIPING PER <br />EVERETT STD PLAN 720, TYP <br />SAWCUT, TYP <br />65+0066+0067+0068+0069+002 753 SY <br />216 <br />224 <br />225 <br />UNKNOWN <br />SAWCT <br />SAWCT <br />SAWCT SAWCT SAWCT SAWCT SAWCT SAWCT SAWCT SAWCT <br />SAWCT SAWCT SAWCT SAWCTWEST MARINE VIEW DRIVE PERRY STROADWAY STRIPING PER <br />EVERETT STD PLAN 720, TYP <br />SAWCUT, TYP STOP BAR AND CROSSWALK <br />PER EVERETT STD PLAN 72160+0061+0062+0063+0064+002 793 SY <br />PROTECT EX CURB IN-PLACE <br />SAWCT SAWCUT <br />APPROX EXTENT OF CONCRETE PANELS <br />APPROX EXTENT OF OVERLAY <br />SIDEWALK, CURB AND GUTTER <br />HMA PAVEMENT, FULL DEPTH <br />2" MILL AND HMA PAVEMENT <br />PLANTING RESTORATION IN KIND <br />SURFACE RESTORATION IN KIND <br />PARTIAL CONCRETE PANEL REPLACEMENT <br />3/4" CRUSHED GRAVEL ROCK <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2404.DWGPlot date 12/8/2025 1:03 PM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />10 402020FEET0 <br />PAVEMENT RESTORATION <br />WMVD PLAN <br />C-2404 <br />69 <br />B. O'NEILL <br />T. FRANKLIN <br />K. WEBER <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> MATCHLINESEE BELOW LEFTMATCHLINESEE ABOVE RIGHTMATCHLINESEE SHEET C-2405MATCHLINESEE SHEET C-2403PLAN <br />SCALE: 1"=20" <br />Know what's below. <br />before you dig.Call <br />R <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING WORK. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY <br />AND ALL DAMAGES ARISING OUT OF THEIR FAILURE TO <br />EXACTLY LOCATE AND PROTECT ALL EXISTING UTILITY <br />FACILITIES. <br />2.REMOVE AND REPLACE CONCRETE AND ASPHALT <br />CEMENT (AC) PAVEMENT AS SPECIFIED. RESTORATION <br />OF IMPROVEMENTS SHALL BE IN ACCORDANCE WITH <br />THE AGENCY WITH JURISDICTION OVER THE <br />RIGHT-OF-WAY (AGENCY) INCLUDING THE CITY OF <br />EVERETT AND WSDOT. <br />3.IF ADDITIONAL PAVEMENT IS CUT OR DAMAGED <br />DURING CONSTRUCTION, IT SHALL BE REMOVED AND <br />REPLACED AS REQUIRED BY AGENCY REQUIREMENTS <br />AT NO ADDITIONAL COST TO THE OWNER. <br />4.CONTRACTOR SHALL FIELD VERIFY AND RESTORE OR <br />REPLACE ALL EXISTING SIGNAGE, STRIPING, MARKINGS, <br />TRAFFIC SIGNALS, LOOP DETECTORS AND CONDUIT, <br />MONUMENTS, STREET IMPROVEMENTS (CURB, <br />GUTTER, CURB RAMPS, ETC), LANDSCAPING, SOD, <br />UTILITY SURFACE FEATURES, AND OTHER FACILITIES TO <br />THE AGENCY REQUIREMENTS. <br />5.CONTRACTOR MUST PERFORM A PRE-CONSTRUCTION <br />SURVEY OF THE EXISTING CONDITIONS AND RESTORE <br />TO PRE-CONSTRUCTION LOCATIONS. <br />6.PAVEMENT REPLACEMENT FOR BYPASS OPERATIONS <br />NOT SHOWN. CONTRACTOR SHALL INCLUDE <br />ADDITIONAL PAVEMENT REPLACEMENT FOR BYPASS <br />ROUTING IN THEIR BID PRICE. <br />7.CONTRACTOR TO COORDINATE ALL RESURFACING <br />WITH AGENCY REQUIREMENTS AND COMPLY WITH <br />ENCROACHMENT PERMIT REQUIREMENTS. MINIMUM <br />LIMITS OF MILLING INCLUDES ALL IMPACTED SURFACES <br />TO LANE LINES OR CURB IF WITHIN 5-FT OR AS <br />REQUIRED BY AGENCY. FOR TRANSVERSE TRENCH <br />CUTS, MINIMUM MILLING REQUIREMENT IS 20-FT <br />FROM TRENCH CUT BOTH DIRECTIONS UNLESS <br />OTHERWISE SHOWN. <br />GENERAL NOTES <br />KEY NOTES <br />LEGEND <br />1 RESTORE CONCRETE PANELS PER WSDOT A-40.10.10-04. <br />MATCH EXISTING SPECIAL BALLAST IN KIND. <br />2 RESTORE AC PAVEMENT PER WSDOT. MIN THICKNESS <br />TO MATCH EXISTING. <br />3 RESTORE AC PAVEMENT PER COE DETAIL 326. MIN <br />THICKNESS TO MATCH EXISTING. <br />FULL DEPTH <br />REPLACEMENT <br />(8" - 12" HMA) <br />MILL AND <br />OVERLAY <br />WEST MARINE VIEW DRIVE 1,645 SY 1,540 SY** <br />** ADDITIONAL AREA FOR MILL AND OVER LAY BASED ON <br />LIMITS SHOWN IN ADDITION TO THE FULL DEPTH AREA <br />SHOWN. SEE G-2014 FOR AREA WITHIN NORTON TERMINAL <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.