Laserfiche WebLink
PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLTCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCE <br />PORT OF EVERETT <br />NORTON TERMINAL <br />50.00'25.00'192'± <br />LIMITS OF TEMPORARY <br />CONSTRUCTION <br />EASEMENT FOR ACCESS <br />TCE AREA 2 <br />KEEP AREA CLEAR FOR <br />SHARED ACCESS <br />2 <br />7 <br />3 <br />7 <br />3 4 <br />6 <br />1 <br />FEDERAL AVE <br />WEST MARINE VIEW DRIVE <br />BNSF ROW <br />TEMPORARY GATE <br />TERMINAL AVEEXIST GATE 2 <br />7 25'7 <br />7 <br />EXIST FENCE <br />CORNER <br />EXIST FENCE <br />CORNER <br />2 <br />10 <br />EXIST FENCE <br />CORNER <br />72 <br />850.00'10 <br />EXISTING CITY <br />UTILITY EASEMENT <br />EX PAVEMENT <br />STRIPING <br />11 <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br />   <br />GENERAL <br />NORTON TERMINAL <br />TCE ENLARGEMENT PLAN 1 <br />G-2015 <br />7 <br />K. WEBER <br />T. FRANKLIN <br />K. WEBERSurveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / #Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\001 G\SHEETS\3815-02-G-2015.DWGPlot date 12/8/2025 9:26 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name #####################20 804040FEET0 <br />1 PROVIDE TEMPORARY FENCING PER SECTION 01 56 26 <br />AND DETAIL 2/CD-2613. <br />2 PROTECT EXISTING PORT SECURITY FENCE IN PLACE. <br />3 REMOVE AND REPLACE EXISTING SECURITY FENCE AND <br />GATES AS REQUIRED TO COMPLETE THE WORK. SEE <br />ADDITIONAL INFORMATION ON CX-2001 AND CX-2002. <br />4 PROVIDE TEMPORARY 25 FT GATE. KEEP ACCESS CLEAR <br />FOR SNOPUD AND PORT ACCESS. COORDINATE LOCATION <br />WITH THE CITY. <br />6 CLEAR AND GRUB AREA. PROVIDE TEMPORARY HAUL <br />ROAD PER DETAIL 3/CD-2611. <br />7 PROVIDE TESC BMP TO PREVENT MIGRATION TO SURFACE <br />WATER, SEDIMENT OR DEBRIS INTO THE PORT SITE OR <br />ADJACENT PROPERTIES. BMP SHALL BE INCLUDED IN <br />CONTRACTOR'S TESC PLAN. AT A MINIMUM, PROVIDE SILT <br />FENCING IN UNIMPROVED AREAS AND COMPOSITE SOCK <br />ON PAVED AREAS UNLESS OTHERWISE REQUIRED OR <br />APPROVED. <br />8 AT THE COMPLETION OF CONSTRUCTION AND USE, <br />RESTORE THE EXISTING ASPHALT TO PRE-CONSTRUCTION <br />CONDITION INCLUDING GRADE AND DRAINAGE, ALL <br />MARKERS, STRIPING, SEALANTS, AND OTHER <br />IMPROVEMENTS. AT A MINIMUM, MILL AND OVERLAY <br />2-INCH OF ASPHALT PAVEMENT. <br />9 REMOVE AND REPLACE EXISTING IMPROVEMENTS AND <br />LANDSCAPING AS REQUIRED TO COMPLETE THE WORK <br />AND PROVIDE ACCESS FOR TRANSIT THROUGH THE SITE. <br />MAINTAIN ACCESS AT ALL TIMES. <br />10 PROVIDE INLET PROTECTION ON ALL STORM CHANNELS, <br />BASINS, AND MANHOLES (BMP C220 - STORM DRAIN INLET <br />PROTECTION OR COE STD 210). PROTECT EXISTING TRENCH <br />DRAIN IN PLACE. <br />11 CONNECT TEMPORARY FENCE TO EXISTING FENCE. <br />CONNECTION MUST MAINTAIN SECURITY OF THE PORT <br />SITE AT ALL TIMES. <br />1.DEMOLISH EXISTING SECURITY FENCE AS REQUIRED TO <br />COMPLETE THE WORK. PROVIDE TEMPORARY FENCE TO <br />SECURE PORT SITE. CONTRACTOR TO PROVIDE SECURABLE <br />GATE FOR TRANSIT THROUGH PORT DURING <br />CONSTRUCTION ACTIVITIES. TCE FOR ACCESS SHARED WITH <br />PORT GARDNER STORAGE FACILITY PROJECT CONTRACTORS. <br />PORT SITE SECURITY MUST BE MAINTAINED AT ALL TIMES. <br />SEE ADDITIONAL REQUIREMENTS PER SECTION 01 12 16 <br />WORK SEQUENCE. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST BE <br />PERFORMED IN ACCORDANCE WITH PSE AND SNOPUD <br />REQUIREMENTS. COORDINATE CONSTRUCTION ACTIVITIES <br />AND SCHEDULE WITH UTILITY OWNER'S. SEE SECTION 02 01 <br />10 AND SECTION 02 01 20. <br />GENERAL NOTES <br />KEY NOTES <br />LEGEND <br />TCE AREA 1 - TRUCK TRANSIT AREA (OUTSIDE <br />SECURE PERIMETER) 67,508 SF <br />TCE AREA 2 - TRUCK TRANSIT AREA (WITHIN <br />SECURE PERIMETER) 103,625 SF <br />TCE AREA 3 - CONSTRUCTION USE <br />20,248 SF FOR STAGING <br />PE AREA 4 - EXISTING CITY EASEMENT STAGING <br />45,585 SF <br />PE AREA 5 - EXISTING CITY EASEMENT FOR <br />TRANSIT XX SF <br />12/09/2025