My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (4)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:09:45 PM
Creation date
4/21/2026 2:04:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Addendums
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />- 1 - <br />129684302.6 0073013-00097 <br />LICENSE AGREEMENT <br />THIS LICENSE AGREEMENT (this “Agreement”) is made and entered into as of <br />__________, 2025 (the “Effective Date”), by and between Port of Everett, a Washington port <br />district (the “Port”), and City of Everett, a Washington municipal corporation (the “City”). The <br />Port and the City are referred to herein individually as a “Party” and collectively as the “Parties.” <br /> RECITALS <br />A. The Port owns certain real property, which is located in the City of Everett, <br />Snohomish County, Washington, as legally described on attached Exhibit A (the “Port Property”). <br />B. The Port, as successor-in-interest as grantor, and the City, as grantee, are parties to <br />that certain Easement Agreement dated July 31, 2019, with Snohomish County Recording No. <br />201907310975 (the “Easement Agreement”). The Easement Agreement provides the City with a <br />non-exclusive easement over a portion of the Port Property that is more fully described in the <br />Easement Agreement (the “Easement Area”). <br />C. The City intends to undertake a major combined sewer and stormwater pipeline <br />project that affects the Easement Area as well as adjacent areas, including portions of West Marine <br />View Drive and the storage facility located north of Norton Terminal. The City has named this <br />project the Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer <br />Project, which is occurring in connection with the City’s Port Gardner Storage Facility project <br />(both projects together, the “PGSF Project”). The PGSF Project includes, among other items, the <br />installation of (2) 48-inch diameter and (1) 24-inch diameter pipelines approximately through the <br />northern 800 feet of the existing easement area. <br />D. In order to construct the PGSF Project, the City needs a temporary license to access <br />those portions of the Port Property described and depicted as “License Area” in Exhibit B attached <br />hereto (the “License Area”) in connection with construction staging, trucking access, and for <br />minor work related to the construction of the PGSF Project. <br />AGREEMENT <br />NOW, THEREFORE, for and in consideration of the terms and conditions of this <br />Agreement and the Recitals described above, which are incorporated herein, as well as the mutual <br />benefits to be derived therefrom, the Parties agree as follows: <br />1. Grant of Temporary License. Subject to the terms and conditions of this <br />Agreement, the Port hereby grants and conveys to the City a temporary, exclusive license over, <br />across and under the License Area set forth in Exhibit B for the purpose of vehicular access and <br />other ancillary uses related to the City’s construction of the PGSF Project, such as construction <br />staging, storage and parking (the “License”). The Parties acknowledge that the License Area <br />consists of three functional sub-areas: (i) a storage sub-area, (ii) a truck transit and staging sub-use <br />area, and (iii) a temporary construction sub-use area (each, a “Sub-Area” and collectively, the <br />“Sub-Areas”). The temporary construction Sub-Area will involve movement of construction <br />equipment (including tracked equipment) and other activities that have a high potential for
The URL can be used to link to this page
Your browser does not support the video tag.