My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (4)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:09:45 PM
Creation date
4/21/2026 2:04:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Addendums
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 45 13 - 6 <br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 WO# UP-3815-02 <br />00 45 13 - 6 BIDDER QUALIFICATION STATEMENT <br />Furnish references for information concerning all work listed above. <br /> NAME TITLE PHONE NUMBER EMAIL ADDRESS <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />5. The Supplemental Instructions to Bidders (Section 00 22 13) states that the Bidder’s <br />project manager for the Project must have successfully supervised to completion at <br />minimum two projects involving excavations reaching a depth of at least 20 feet, the <br />installation of trench support systems, ground water pumping, and the handling and <br />disposal of groundwater. Two separate projects must be used to satisfy this requirement. <br />List the projects that show the project manager Identified above has this experience. <br /> PROJECT NAME YEAR OWNER LOCATION CONTRACT VALUE <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.