My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (4)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:09:45 PM
Creation date
4/21/2026 2:04:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Addendums
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
STANDARD DETAILS <br />MOD <br />NOTES <br />1.ALL TRENCHES IN ROADWAY AREAS SHALL BE <br />BACKFILLED AND PATCHED WITH TEMPORARY ASPHALT <br />AT THE END OF EACH WORK DAY, UNLESS PERMISSION <br />IS GRANTED TO DO OTHERWISE BY THE CITY ENGINEER. <br />2.ALL TEMPORARY PATCHES ON TRENCHES SHALL BE <br />PERMANENTLY PATCHED WITHIN 2 WEEKS OF <br />COMPLETION OF WORK WITHIN ROADWAY AREA. <br />3.CEMENT CONCRETE FOR PATCHING SHALL BE <br />COMMERCIAL MIX AS CALLED OUT IN WSDOT <br />STANDARD SPECIFICATIONS. <br />4.IN IMPROVED OR PAVED AREAS WHERE THE TRENCH IS <br />BACKFILLED WITH UNIFORMLY GRADED SAND BACKFILL, <br />PROVIDE A SEPARATION GEOTEXTILE BETWEEN THE <br />SAND BACKFILL AND OVERLYING BASE COURSE, MIRAFI <br />N170 OR EQUAL. <br />, SEE NOTE 4 <br />, SEE NOTE 4 <br />, SEE NOTE 4 <br />1Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / #Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-CD-4003.DWGPlot date 1/26/2026 2:16 PM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name #####################STANDARD DETAILS <br />STANDARD DETAILS 312, 326, 401, 402 <br />CD-4003 <br />100 <br />R. DAVIES <br />T. FRANKLIN <br />K. WEBER <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />44572 <br />01/13/26 BD <br />01/27/26 DB ADDENDUM 2 <br />1
The URL can be used to link to this page
Your browser does not support the video tag.