My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (4)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:09:45 PM
Creation date
4/21/2026 2:04:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Addendums
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Erosion and Sedimentation Control <br />Project No. 180162 31 25 00 - 12 <br /> <br />J. At end of each work day, stabilize or cover soil stockpiles or implement other BMPs to <br />prevent discharges to surface waters or conveyance systems leading to surface waters. <br />K. Temporarily stabilize soils at end of shift before holidays and weekends, if needed. <br />Ensure soils are stable during rain events at all times of year. <br />L. Initiate stabilization by no later than end of next work day after construction work in an <br />area has stopped permanently or temporarily. <br />M. Provide permanent erosion control measures on all exposed areas. Do not remove <br />temporary sediment control practices until permanent vegetation or other cover of <br />exposed areas is established. However, do remove all temporary erosion control <br />measures as exposed areas become stabilized, unless doing so conflicts with local <br />requirements. Properly dispose of construction materials and waste, including sediment <br />retained by temporary BMPs. <br />3.02 SEQUENCING AND SCHEDULING <br />A. Submit a TESC Plan for each phase of construction or whenever significant modifications <br />are made to the current TESC Plan or its implementation. <br />1. Contractor shall revise the TESC Plan and its implementation as needed or when <br />requested by the Owner’s Representative based on the actual construction methods, <br />procedures, and observed performances of the provided measures. <br />B. Establish measures identified for implementation prior to commencing any clearing, <br />grading, excavation, or other work that will disturb the ground surface. Surface water <br />drainage and erosion and sediment control devices must be provided before other work <br />commences. <br />C. Perform periodic inspections as required by the TESC Plan. <br />1. The frequency will depend on the time of the year and the construction activities <br />underway at any given time. <br />2. Unless otherwise required, each TESC measure shall be inspected daily and <br />immediately after each rainfall event greater than 0.1 inch of rainfall in 24 hours. <br />3. Prepare TESC Inspection Reports for each inspection and include the report in the <br />TESC file and Site Log Book. <br />4. Submit a record copy of each report to the Owner’s Representative daily. <br />5. Preparing and maintaining an TESC file and Site Log Book. <br />D. Maintain TESC measures for the duration of the contract and/or until restoration of <br />surfaces and ground cover is established to prevent erosion and sedimentation and to <br />ensure stormwater, groundwater and surface flows will be conveyed and controlled in <br />accordance with applicable regulations. <br />E. TESC measures shall be installed, maintained, and removed as indicated in the most <br />recent revision of the approved TESC Plan. <br />1. Any maintenance of facilities which might necessitate unavoidable interruption of <br />operation shall be scheduled during noncritical water quality periods and carried out <br />in a manner approved by the Owner’s Representative.
The URL can be used to link to this page
Your browser does not support the video tag.