My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/22/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:04:00 PM
Creation date
4/22/2026 11:17:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.1
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
January 3, 2025 <br />HWA Project No. 2021-159-21 <br />Geotechnical Engineering Report 14 HWA GEOSCIENCES INC. <br />Port Gardner Storage Facility <br />4.2 SEISMIC DESIGN CRITERIA <br />The structural resiliency of the existing and proposed structures and the site piping will be <br />evaluated using the 2021 International Building Code (IBC), which requires that above-grade <br />structures be designed for the inertial forces induced by a “Maximum Considered Earthquake” <br />(MCE), corresponding to an earthquake with a 2% probability of exceedance in 50 years <br />(approximately 2,475-year return period). <br />As part of the procedure to evaluate seismic forces, the 2021 IBC requires the evaluation of the <br />Seismic Site Class, which categorizes the site based upon the characteristics of the subsurface <br />profile extending to 100 feet below the proposed foundation. Based on the obtained SPT blow <br />counts noted in the boring logs and extrapolated to a depth of 100 feet, the site class classifies as <br />a Site Class “E” soil. However, due to the presence of potentially liquefiable soils, the site <br />qualifies as a Site Class “F” as defined in Table 20.3-1 of ASCE 07-16. The exception in Section <br />20.3.1 of ASCE 07-16 permits the Site Class to be determined in accordance with Section 20.3 <br />and the corresponding values of Fa and Fv determined from Tables 11.4-1 and 11.4-2, provided <br />the fundamental period of the building (T) is less than ½ second. In Section 11.4.8 of ASCE 7- <br />16, it is stated that a site-specific ground motions hazard analysis is required on sites with three <br />additional conditions: <br />1) Seismically isolated structures and structures with dampening systems on site with S1 <br />greater than or equal to 0.6. <br />2) Structures on Site Class E sites with Ss greater than or equal to 1.0. <br />3) Structures on Site Class D and E sites with S1 greater than or equal to 0.2. <br />Condition 1 should be determined by the project structural engineer but is assumed to not apply <br />to the proposed site improvements. Conditions 2 and 3 would necessitate performing a site- <br />specific ground motion hazard analysis on this site; however, three exceptions are provided, in <br />section 11.4.8 of ASCE 7-16, to determine seismic design parameters without performing a site- <br />specific ground motions hazard analysis. These exceptions are: <br />1) Structures on site Class E site with SS greater than or equal to 1.0, provided the site <br />coefficient Fa is taken to be equal to that of Site Class C. <br />2) Structures of Site Class D sites with S1 greater than or equal to 0.2, provided the <br />value of the seismic response coefficient (Cs) is determined by Eq 12.8-2 of ASCE 7- <br />16 for values of T ≤ 1.5Ts and taken as equal to 1.5 times the value computed in <br />accordance with either Equation 12.8-3 of ASCE 7-16 for TL ≥ T > 1.5Ts, or <br />Equation 12.8-4 of ASCE 7-16 for T > TL.
The URL can be used to link to this page
Your browser does not support the video tag.