My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/22/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:04:00 PM
Creation date
4/22/2026 11:17:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.1
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
January 3, 2025 <br />HWA Project No. 2021-159-21 <br />Geotechnical Engineering Report 37 HWA GEOSCIENCES INC. <br />Port Gardner Storage Facility <br />• Due to the presence of groundwater, micropiles may be preliminarily designed and <br />installed in accordance with Case I, Type B requirements as specified in FHWA NHI-05- <br />039 (FHWA, 2005). <br />• Drilling methods should be determined by the contractor. Drilling methods shall be <br />capable of advancing through wood debris and dense glacial soils. <br />• Micropiles may be preliminarily designed using ultimate grout-to-ground interface bond <br />strength of 35 psi in dense glacial soils and 10 psi in the bay deposits. Grout-to-ground <br />strength should be neglected in areas where wood deposits and other fill is present. <br />• Down drag loads presented in Table 3 assume uncased micropiles and residual shear <br />strengths of liquefiable soils. Down drag values can be reduced for micropiles cased in <br />the liquefaction zone. <br />• To increase micropile capacity, the contractor's design may include permanent cased <br />sections through the non-liquefiable layer (i.e., crust) above the liquefiable layer to <br />reduce down drag loads; alternatively, the contractor may increase micropile embedment <br />below the liquefiable layer into dense outwash soils. Final pile depths will be determined <br />by the contractor. <br />• Pre-production testing should be performed as discussed in Section 4.6.7. <br />4.6.7 Micropile Construction <br />An experienced and competent contractor should be retained to install micropiles. Final design of <br />the micropile foundation systems should be based on available data and the results of pre- <br />production testing. <br />Verification load testing should be performed on one or more pre-production test piles per <br />structure near locations where the micropiles are planned (i.e. four areas). Load testing should be <br />performed prior to installation of the production piles and the test piles should be sacrificial. A <br />representative of HWA should be present during pre-production pile load testing to observe and <br />document testing conditions and results. Based on the results of the load tests, design axial <br />capacities may be reevaluated for planned production piles. The verification test is to verify the <br />design and adequacy of the contractor’s drilling, installation, and grouting operations. Each <br />verification micropile must be constructed with the identical materials, dimensions, tip <br />elevations, and installation methods as the production micropiles it represents (i.e. four areas).
The URL can be used to link to this page
Your browser does not support the video tag.