My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/22/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:04:00 PM
Creation date
4/22/2026 11:17:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.1
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
January 3, 2025 <br />HWA Project No. 2021-159-21 <br />Geotechnical Engineering Report 42 HWA GEOSCIENCES INC. <br />Port Gardner Storage Facility <br />4.8.1 Buoyancy and Uplift Considerations <br />Buried structures will experience an upward buoyant force when groundwater levels outside the <br />structures are higher than the fluid level inside the structures. The weight of the structure will <br />provide resistance to uplift forces. In addition, extending the base of the foundation beyond its <br />outside perimeter will increase uplift resistance of the structure. HWA recommends using a <br />design groundwater elevation equal to the ground surface. <br />If an extended base slab is used, the weight of the soil overlying the footing, such as compacted <br />structural fill or controlled density fill (CDF), can be calculated as shown on Figure 6A. HWA <br />understands that buried structures will be situated within properly backfilled and compacted <br />excavations per the recommendations of this report, and that some buried structures will have an <br />extended base slab to mitigate uplift. <br />Because HWA recommends installation of bond breakers to minimize down drag loading, side <br />friction should be ignored for buoyancy resistance calculations. <br />4.8.2 Lateral Earth Pressures <br />Bottom elevations of proposed manhole and vault structures, the Effluent Pump Station, and Lift <br />Station 46 will be on the order of about 13 to -15 feet (approximately 3 to 32 feet bgs). These <br />structures should be designed to resist the lateral earth pressures shown on Figures 6B and 6C. <br />As indicated in the figures, the maximum design groundwater elevation should be assumed at the <br />ground surface to account for the extreme event when the backfill material is temporarily <br />saturated. The earth pressures provided assume that the walls of the structure will not be free to <br />deflect, and at-rest earth pressures will develop. <br />4.9 UTILITIES <br />HWA understands that the proposed project will include the construction of several underground <br />utilities. Given the potential for settlement throughout the project site (i.e., biodegradation of <br />wood, consolidation settlement, and liquefaction-induced settlement), HWA recommends that <br />underground utilities be supported on deep foundations with flexible piping material. However, <br />HWA understands that not all the proposed utilities will be pile supported. <br />Seismic-induced liquefaction settlements are anticipated along the utility alignments. <br />Liquefaction-induced settlements of up to 26 inches may occur as a result of the design <br />earthquake. HWA expects these settlements to be differential in nature along utility alignments <br />and may cause damage or failure of the utilities. In addition, some of the utility alignments may <br />undergo liquefaction-induced lateral spreading during the design earthquake. The magnitude of <br />lateral spreading is likely to vary along the alignment with the greatest displacements occurring
The URL can be used to link to this page
Your browser does not support the video tag.