My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/22/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:04:00 PM
Creation date
4/22/2026 11:17:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.1
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CLARIFIERTANK? <br />? <br />? <br />? <br />? <br />? <br />? <br />? <br />? <br />? <br />? <br />? <br />??????????????????????? <br />????????????? <br />? <br />? <br />? <br />? <br />? <br />? <br />???? <br />WOOD <br />FILL <br />RECESSIONAL OUTWASH <br />ADVANCE OUTWASHADVANCE OUTWASH <br />FILL <br />BAY DEPOSITS HWA-12HWA-13POUTFALLMANHOLEDISTRIBUTIONCHAMBERCLARIFIERTANK? <br />? <br />? <br />? <br />? <br />? <br />? <br />? <br />? <br />? <br />? <br />? <br />????? <br />? <br />? <br />? <br />? <br />? <br />? <br />? <br />? <br />????? <br />FILL <br />BAY DEPOSITS <br />BAY DEPOSITS <br />ADVANCE OUTWASH <br />WOOD <br />WOOD HWA-11HWA-10PINFERRED GEOLOGIC <br />CONTACT <br />EXPLORATION DESIGNATION <br />BOTTOM OF EXPLORATION <br />WATER LEVEL IN WELL <br />AND DATEHWA-3BORE LEGEND <br />ADVANCE OUTWASH <br />BAY DEPOSITS <br />RECESSIONAL OUTWASH <br />SOILS LEGEND <br />FILL <br />0 25 50 75 100 <br />HORIZ. / VERT. SCALE: 1" = 50' <br />GEOLOGIC CROSS <br />SECTION A-A' <br />SM/SRB <br />CF <br />FIGURE NO.: <br />PROJECT NO.: <br />DRAWN BY: <br />CHECK BY: <br />C:\USERS\CFRY\DESKTOP\2021-159-21 PORT GARDNER STORAGE FACILITY\2021-159-21 PORT GARDNER STORAGE FACILITY.DWG <3A> Plotted: 8/7/2024 11:22 AM <br />3A <br />DBE/MWBE 2021-159-21 <br />SCREEN <br />NOTE: THE SUBSURFACE CONDITIONS SHOWN ARE BASED ON WIDELY SPACED BORINGS AND SHOULD <br />BE CONSIDERED APPROXIMATE. FURTHERMORE, THE CONTACT LINES SHOWN BETWEEN UNITS ARE <br />INTERPRETIVE IN NATURE AND MAY VARY LATERALLY OR VERTICALLY OVER RELATIVELY SHORT <br />DISTANCES ON SITE. <br />WOOD <br />-100' <br />-120' <br />-75' <br />-50' <br />-25' <br />0' <br />25' <br />A' <br />50' <br />-100' <br />-120' <br />-75' <br />-50' <br />-25' <br />0' <br />25' <br />A <br />50' <br />0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 <br />4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 <br />-100' <br />-120' <br />-75' <br />-50' <br />-25' <br />0' <br />25' <br />50' <br />-100' <br />-120' <br />-75' <br />-50' <br />-25' <br />0' <br />25' <br />50'MATCHLINEMATCHLINE(OFFSET, 7.57'R)(OFFSET, 0.5'R)(OFFSET, 1'L)(OFFSET, 1'L)BLOW COUNT "N-VALUE " <br />WATER LEVEL AT TIME OF <br />DRILLING <br />ASSUMED GROUND WATER LEVEL <br />PORT GARDNER STORAGE FACILITY <br />FACILITY CONSTRUCTION <br />PACKAGE WO#UP-3525 <br />EVERETT, WASHINGTON
The URL can be used to link to this page
Your browser does not support the video tag.