My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/22/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:04:00 PM
Creation date
4/22/2026 11:17:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.1
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
BUOYANT FORCE PARAMETERS <br />FOR UNDERGROUND STRUCTURES 6A <br />DRAWN BY: <br />PROJECT # <br />C:\USERS\CFRY\DESKTOP\2021-159-21 PORT GARDNER STORAGE FACILITY (LEP)\2021-159-21 PORT GARDNER STORAGE FACILITY (LEP).DWG <6A> Plotted: 8/7/2024 12:11 PM <br />CHECK BY: <br />FIGURE NO.: <br />DBE/MWBE CF <br />2021-159-21 <br />PORT GARDNER STORAGE FACILITY <br />FACILITY CONSTRUCTION PACKAGE WO#UP-3525 <br />EVERETT, WASHINGTON <br />ALP <br />BUOYANT FORCE
The URL can be used to link to this page
Your browser does not support the video tag.