Laserfiche WebLink
Landau Associates <br />Soil and Groundwater Management Plan 0121049.020.024 <br />MIE Norton Terminal 10-1 June 22, 2021 <br />10.0 REFERENCES <br />Aspect. 2021. Report for Second Interim Action, Kimberly-Clark Worldwide Site Upland Area, Everett, <br />Washington. Aspect Consulting. March 3. <br />Aspect. 2019. Work Plan for Second Interim Action, Kimberly-Clark Worldwide Site Upland Area, <br />Everett, Washington. Aspect Consulting. December 13. <br />Aspect. 2016. Draft Remedial Investigation and Feasibility Study: Chapters 1 Through7, Kimberly-Clark <br />Worldwide Site Upland Area, Everett, Washington. Aspect Consulting. March 16. <br />K-C. 2018. Plan of Operations Crushed Material Removal Kimberly-Clark Former Mill Property, Everett, <br />Washington. Kimberly-Clark Worldwide. July 10. <br />LAI. 2021. Technical Memorandum: MTCA 3rd Interim Action & Maritime Industrial Expansion at <br />Norton Terminal—Preload Ground Improvement, Port of Everett, Everett, Washington. Landau <br />Associates, Inc. April 6.