My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 2:55:34 PM
Creation date
4/22/2026 2:02:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.2
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ASPECT CONSULTING <br />48 FINAL PROJECT NO. AS190583A-08 MAY 21, 2025 <br />of K-C and Ecology conducted an initial reconnaissance of the shoreline intertidal area <br />during lower low tide stage. The initial reconnaissance included visual observation and <br />documentation of pipe conditions, pipes discharging water, bulkhead conditions, and <br />diffuse seepage emanating from the intertidal beach. Measurements of water quality field <br />parameters (EC, pH, and temperature) were collected for most of the observed water <br />discharges, and multiple field parameter measurements were collected from select <br />discharge locations during outgoing (ebb) and incoming (flood) tidal stages. Using that <br />information, an Addendum to the RI/FS Work Plan (Aspect, 2016a) was prepared and <br />approved by Ecology to conduct a supplemental round of intertidal seep sampling and <br />analysis. Because the intent was to characterize the quality of upland groundwater <br />discharge, not tidal water, the Addendum required sampling of water discharges with EC <br />less than 25 millisiemens per centimeter (mS/cm). <br />The supplemental seep sampling program was conducted during lower low tide stages on <br />two nights: October 18 and 20, 2016. On the first night, field parameter measurements <br />were conducted at visible seepage locations across the entire accessible intertidal <br />shoreline. Any seep locations with measured EC below 25 mS/cm were designated for <br />subsequent sampling on the second night. Also at those locations, passive in situ diffusive <br />gradient in thin film (DGT) samplers were deployed at a depth of approximately 6 inches <br />below mudline to measure free sulfide concentrations within the sediment bioactive zone, <br />in accordance with the Work Plan Addendum. In total during August and October 2016, <br />field parameters were measured at 16 intertidal locations: 14 beach seeps, an uncapped <br />pipe on the beach under the north end of the (labeled Discharge 4A), and a hole in the <br />timber bulkhead in the timber bulkhead several feet above mudline near the north end of <br />the shoreline (former Naval Reserve parcel), labeled Discharge 1A. <br />Based on the first night’s field measurements, seep samples were collected during the <br />second night at five locations with EC measured below 25.0 mS/cm: Seep-3 located next <br />to the former barge unloading dock near the south end of the former Log Pond, and <br />Seeps-10, -11, -12, and -13 located at the base of the former Naval Reserve parcel timber <br />bulkhead. The field parameter data from saline seeps not sampled for chemical analysis <br />are also presented in this RI/FS. The seep samples were collected using a PushPoint™ <br />stainless steel sampler inserted generally horizontally into the beach to submerge its <br />4-cm stainless steel mesh screen within the upper 10 cm of sediment. Sampling of the last <br />location (Seep-10) was conducted as the tide water was encroaching on the location, but <br />the sampler remained submerged in sediment 17. The DGT samplers were also retrieved <br />during the second night, after approximately 48 hours immersion. Ecology participated in <br />both night’s activities, and collected split samples for chemical analysis at the Manchester <br />Environmental Laboratory. <br />Each of the seep water samples were submitted for analysis of total ammonia and <br />dissolved metals (arsenic, copper, lead, mercury, nickel, and zinc) using analytical <br />methods specified in the QAPP (Aspect, 2013c), and for salinity using Standard Method <br />SM 2520B. In addition, the Seep-3 sample was analyzed for low-level PAHs. <br /> <br />17 Sample Seep-10 was inundated by the tide at the time of sampling.
The URL can be used to link to this page
Your browser does not support the video tag.