Laserfiche WebLink
PORT GARDNER BAY <br />EAST WATERWAY <br />WEST MARINE VIEW DRIVE (SR 529) <br />NORTON AVE <br />(PORT OF EVERETT) <br />DUNLAP <br />(PORT OF <br />EVERETT) <br />CITY OF <br />EVERETT <br />POGAR <br />STORMWATER <br />FACILITY <br />FEDERAL AVE <br />D <br />D <br />D <br />D <br />D <br />PORT OF EVERETT <br />1601 5th Avenue, Suite 1300 <br />Seattle, Washington 98101 <br />(206)382-0600 Fax (206) 382-0500 <br />PROJECT NO. 1600120 <br />BID SET <br />G1.6 <br />NOTES <br />TESC MEASURES FOR THE POE NORTON TERMINAL EARLY ACTION PRELOAD INCLUDE: <br /> EXTEND EXISTING BERM AT SITE'S SOUTH END TO FORM A CONTINOUS BARRIER ALONG SHORELINE <br /> MAINTAIN EXISTING BERM ALONG SITE'S WEST & NORTH SIDES <br /> MAINTAIN INFILTRATION OF ALL ON-SITE DRAINAGE AND ALLOW NO SURFACE WATER DISCHARGE FROM SITE <br /> PRELOAD MATERIALS SHALL BE PLACED ON TOP OF EXISTING CLEAN SAND BACKFILL <br /> NO EXCAVATION REQUIRED <br />CRUSHED ROCK <br />PRELOAD FOOTPRINT