My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 2:55:34 PM
Creation date
4/22/2026 2:02:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.2
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PORT GARDNER BAY <br />EAST WATERWAY <br />WEST MARINE VIEW DRIVE (SR 529) <br />NORTON AVE <br />(PORT OF EVERETT) <br />DUNLAP <br />(PORT OF <br />EVERETT) <br />CITY OF <br />EVERETT <br />POGAR <br />STORMWATER <br />FACILITY <br />FEDERAL AVE <br />D <br />D <br />D <br />D <br />D <br />PORT OF EVERETT <br />1601 5th Avenue, Suite 1300 <br />Seattle, Washington 98101 <br />(206)382-0600 Fax (206) 382-0500 <br />PROJECT NO. 1600120 <br />BID SET <br />G1.6 <br />NOTES <br />TESC MEASURES FOR THE POE NORTON TERMINAL EARLY ACTION PRELOAD INCLUDE: <br /> EXTEND EXISTING BERM AT SITE'S SOUTH END TO FORM A CONTINOUS BARRIER ALONG SHORELINE <br /> MAINTAIN EXISTING BERM ALONG SITE'S WEST & NORTH SIDES <br /> MAINTAIN INFILTRATION OF ALL ON-SITE DRAINAGE AND ALLOW NO SURFACE WATER DISCHARGE FROM SITE <br /> PRELOAD MATERIALS SHALL BE PLACED ON TOP OF EXISTING CLEAN SAND BACKFILL <br /> NO EXCAVATION REQUIRED <br />CRUSHED ROCK <br />PRELOAD FOOTPRINT
The URL can be used to link to this page
Your browser does not support the video tag.