My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 2:55:34 PM
Creation date
4/22/2026 2:02:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.2
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ASPECT CONSULTING <br />ii FINAL PROJECT NO. AS190583A-08 MAY 21, 2025 <br />3.1.12 Latex Spill Investigation (2009) ........................................................... 32 <br />3.1.13 Characterization of Soil Removed from Sand Filter 1 Foundation (Old <br />Boiler House) (2011) .......................................................................... 33 <br />3.1.14 Phase 1 ESA (2011) ........................................................................... 33 <br />3.2 Independent Phase 2 ESA (2012) ............................................................ 35 <br />3.3 Hazardous Waste Accumulation Unit Closure (2012) .............................. 39 <br />4 Remedial Investigation Activities ............................................................. 41 <br />4.1 First Interim Action (2013-2014) ............................................................... 43 <br />4.1.1 Soil Removal during First Interim Action ............................................. 43 <br />4.1.2 Interim Action Confirmational Groundwater Monitoring (2014-2016) ... 44 <br />4.2 Additions to RI/FS Work Plan ................................................................... 45 <br />4.2.1 Vapor Intrusion Assessment for Distribution Warehouse (March and <br />November 2014) ................................................................................. 45 <br />4.2.2 Intertidal Porewater and Seep Sampling (February and August 2014) 46 <br />4.2.3 Supplemental Intertidal Porewater Sampling for Free Sulfide (February <br />2015) .................................................................................................. 47 <br />4.2.4 Supplemental Data Collection Supporting FS (September 2015) ........ 47 <br />4.2.5 Supplemental Intertidal Seep Sampling (October 2016) ..................... 47 <br />4.2.6 Supplemental Site-Wide Groundwater Sampling (March 2017) .......... 49 <br />4.2.7 Supplemental Investigation of Log Pond (March-July 2017) ............... 49 <br />4.3 Second Interim Action (2020) ................................................................... 50 <br />4.4 City of Everett Investigation and Cleanup of Drainage Swale on their <br />Property (2019-2021) ............................................................................... 51 <br />4.5 Groundwater pH Monitoring during CM Removal ..................................... 53 <br />4.6 MIE Geotechnical Explorations (2020-2022) ............................................ 54 <br />4.7 Combined Sewer Main Improvements (2022) .......................................... 54 <br />4.8 Third Interim Action (2021-2023) .............................................................. 55 <br />5 Preliminary Cleanup Levels (PCLs) ......................................................... 57 <br />5.1 Current and Future Land and Water Uses ............................................... 57 <br />5.1.1 Land Use ............................................................................................ 57 <br />5.1.2 Water Use .......................................................................................... 59 <br />5.2 Potential Receptors and Exposure Pathways .......................................... 59 <br />5.2.1 Soil Exposure Pathways ..................................................................... 59 <br />5.2.2 Groundwater Exposure Pathways ...................................................... 60 <br />5.3 Development of Soil, Groundwater, and Air Preliminary Cleanup Levels . 61 <br />5.3.1 Groundwater PCLs ............................................................................. 61 <br />5.3.2 Soil PCLs ........................................................................................... 62 <br />5.3.3 Air PCLs and Screening Levels .......................................................... 65 <br />6 Remedial Investigation Results ................................................................ 66 <br />6.1 Data Set Used for Remedial Investigation ................................................ 66 <br />6.2 Site Units for Remedial Investigation........................................................ 66 <br />6.2.1 Unit A ................................................................................................. 67 <br />6.2.2 Unit B ................................................................................................. 67
The URL can be used to link to this page
Your browser does not support the video tag.