My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 2:55:34 PM
Creation date
4/22/2026 2:02:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.2
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ASPECT CONSULTING <br />iv FINAL PROJECT NO. AS190583A-08 MAY 21, 2025 <br />8.6.6 Contingent Actions for Warehouse Subarea ..................................... 141 <br />8.6.7 Contingent Action for PUD Electrical Substation ............................... 143 <br />8.6.8 Estimated Cost for Cleanup Alternative and Contingent Actions ....... 144 <br />8.7 Analysis of the Cleanup Alternative ........................................................ 144 <br />8.7.1 MTCA Requirements for Cleanup Actions ........................................ 144 <br />8.8 Preferred Cleanup Alternative ................................................................ 150 <br />8 References ............................................................................................... 152 <br />9 Limitations ................................................................................................ 162 <br /> <br />List of Tables <br />2-1 Vertical Gradient Calculations for Log Pond Area <br />2-2 Fill Unit Hydraulic Conductivity Estimates from Tidal Study Data <br />2-3 Hydraulic Conductivity Estimates from Slug Tests in Log Pond Area <br />2-4 Estimates of Groundwater Velocity and Flux from Upland Area to East <br />Waterway <br /> <br />5-1 Groundwater Preliminary Cleanup Levels for Industrial Use Area <br />5-2 Groundwater Preliminary Cleanup Levels for Warehouse Subarea if <br />Redeveloped for Commercial Use <br />5-3 Soil Preliminary Cleanup Levels for Industrial Use Area <br />5-4 Soil Preliminary Cleanup Levels for Warehouse Subarea <br />5-5 Site-Specific Soil Organic Carbon Data <br />5-6 Air Preliminary Cleanup Levels and Screening Levels <br /> <br />6-1 Statistical Summary of Soil Quality Data Representing Current Site <br />Conditions <br />6-2 Statistical Summary of Groundwater Quality Data Representing Current <br />Site Conditions <br />6-3 Statistical Summary of Soil Data for Warehouse Subarea <br />6-4 Statistical Summary of Groundwater Data for Warehouse Subarea <br />6-5 Comparing Average Site Groundwater pH for Wet and Dry Seasons, <br />2016, 2017, and 2020 <br />6-6 Notes and Definitions for Section 6 Data Tables
The URL can be used to link to this page
Your browser does not support the video tag.