My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 2:55:34 PM
Creation date
4/22/2026 2:02:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.2
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ASPECT CONSULTING <br />PROJECT NO. AS190583A-08 MAY 21, 2025 FINAL ix <br /> <br />6-S2 Metals Exceedances in Shoreline Groundwater and Intertidal <br />Porewater/Seeps <br />6-S3 Un-Ionized Ammonia (NH3) Exceedances in Upland Groundwater and <br />Intertidal Porewater/Seeps <br />6-S4 Sulfide Exceedances in Upland Groundwater and Intertidal <br />Porewater/Seeps <br /> <br />8-1 Distribution of Residual Soil and Groundwater Contamination <br />8-2 Components of the Cleanup Alternative <br /> <br />List of Appendices <br />A Interim Cleanup Action (IA) Reports <br />B Boring/Well Construction Logs and Water Level Data for Explorations <br />Incorporated into RI <br />C RI Data Validation Reports <br />D City Utility Property Cleanup Action Plan Memorandum <br />E Background Arsenic in Groundwater <br />F Derivation of Area-Specific, Risk-Based TPH Soil Preliminary Cleanup <br />Levels for Industrial Use Area <br />G Groundwater pH Data Collected During CM Removal Project, 2020 <br />H Background Information Regarding Ammonia and Sulfide <br />I Statistical Analysis Output for Soil Metals Data (ProUCL Software) <br />J PCB Congener Histograms for Common PCB Aroclors <br />K Log Pond Investigation Results <br />L Selected Photographs <br />M Detailed Cost Estimate for the Cleanup Alternative <br />N Environmental Health Disparity and Demographic Index <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.