My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 2:55:34 PM
Creation date
4/22/2026 2:02:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.2
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ASPECT CONSULTING <br />PROJECT NO. AS190583A-08 MAY 21, 2025 FINAL xi <br /> <br />DAHP Department of Archaeology and Historic Preservation <br />DGT diffusive gradient in thin film gel technology <br />DMMP Dredged Material Management Program <br />D.O. dissolved oxygen <br />DOH Washington Department of Health <br />East Waterway In-Water Area seaward of mean higher high water of Site <br />Ecology Washington State Department of Ecology <br />EHD Environmental Health Disparities <br />EPA U.S. Environmental Protection Agency <br />EPH extractable petroleum hydrocarbons <br />ERNS Emergency Response Notification System <br />ESA Environmental Site Assessment <br />E1UB estuarine subtidal unconsolidated bottom (habitat) <br />FS Feasibility Study <br />ft3/ft2-year cubic feet/square foot per year <br />ft3/yr cubic feet per year <br />GF General Fill <br />gpm gallons per minute <br />HWAU Hazardous Waste Accumulation Unit <br />HDPE high density polyethylene <br />HREC historical recognized environmental condition <br />IA interim action <br />IACL interim action cleanup level <br />IDP Inadvertent Discovery Plan <br />IHS indicator hazardous substance <br />K hydraulic conductivity <br />K-C Kimberly-Clark Worldwide, Inc. <br />lb pound <br />lb/day pound per day <br />LG licensed geologist <br />LHG licensed hydrogeologist <br />LUST leaking underground storage tank
The URL can be used to link to this page
Your browser does not support the video tag.