My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 2:55:34 PM
Creation date
4/22/2026 2:02:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.2
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ASPECT CONSULTING <br />PROJECT NO. AS190583A-08 MAY 21, 2025 FINAL ES-1 <br /> <br />Executive Summary <br />The remedial investigation and feasibility study (RI/FS) for the Upland Area of the <br />Kimberly-Clark Worldwide Site, a former pulp and paper mill, in Everett, Washington, <br />has been completed to address environmental contamination from decades of industrial <br />activity. The RI/FS has been conducted in accordance with Washington State Department <br />of Ecology (Ecology) Agreed Order No. DE 9876 (Agreed Order) and consistent with the <br />Washington State Model Toxics Control Act (MTCA). The Site includes portions of <br />upland and in-water areas along the East Waterway of Port Gardner Bay where hazardous <br />substances have been deposited, stored, disposed of, placed, or otherwise come to be <br />located. The Agreed Order specifically addresses the Upland Area; the In-Water Area, <br />seaward of mean higher high water (MHHW), is being addressed under a separate Agreed <br />Order for the East Waterway (Agreed Order No. DE 11350). <br />The Upland Area comprises approximately 54 acres located in an industrial area on the <br />west side of downtown Everett, Washington. Since the site’s initial development in the <br />late 1800s, various industrial businesses operated on the Upland Area, most recently a <br />pulp and paper mill. Following shutdown of the mill in 2012, all structures were <br />demolished except for the distribution warehouse, located near the southern property <br />boundary. <br />The northernmost 8.9 acres of the Upland Area contains the former mill wastewater <br />treatment plant (WWTP) and is currently owned by the City of Everett and referred to as <br />the City Utility Property. The remaining 46 acres of the Upland Area is owned by the Port <br />of Everett and is currently used as a terminal cargo yard. The only mill structures <br />remaining on the Port property are the distribution warehouse and an active Snohomish <br />County Public Utility District (PUD) electrical substation. <br />Prior to the Agreed Order, independent remedial actions conducted between 1989 and <br />2009 included decommissioning and removal of 9 underground storage tanks (USTs) and <br />2 aboveground storage tanks (ASTs), localized remedial excavation of petroleum- or <br />xylene-contaminated soils in four discrete areas, and removal of polychlorinated biphenyl <br />(PCB)-containing transformers and underlying PCB-contaminated concrete and soil. The <br />RI/FS report presents the results of these remedial actions, and information obtained <br />during Upland Area investigations completed between 1989 and 2012, the first formal <br />interim cleanup action (IA) conducted in 2013-2014, the RI characterization completed <br />between 2013 and 2017, the second IA conducted in 2020, and the third IA conducted in <br />2023. The data used in the RI is representative of current conditions for the Upland Area, <br />following completion of the IAs. <br />Interim Actions <br />The three IAs were conducted following mill demolition activities and generally consisted <br />of the following elements:
The URL can be used to link to this page
Your browser does not support the video tag.