My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 2:55:34 PM
Creation date
4/22/2026 2:02:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.2
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ASPECT CONSULTING <br />ES-4 FINAL PROJECT NO. AS190583A-08 MAY 21, 2025 <br /> If the warehouse is demolished, excavation and landfilling of TPH-contaminated soils <br />and then capping of the building’s footprint. <br />In addition, the preferred Cleanup Alternative includes a contingent cleanup action for the <br />Snohomish PUD Substation area to be implemented at the time the PUD decommissions <br />the facility. <br />The preferred Cleanup Alternative protects human health and the environment and <br />complies with the MTCA threshold and additional criteria for selecting a cleanup action, <br />including consideration of public concerns, and potentially affected Indian Tribes, <br />vulnerable populations, and overburdened communities, and is considered permanent to <br />maximum extent practicable, in accordance with WAC 173-340-360. The preferred <br />Cleanup Alternative provides for monitoring to ensure that contaminants in groundwater <br />are not discharging to surface water at concentration that pose a risk to marine receptors <br />and provides for contingent remedial action if monitoring indicates that groundwater <br />discharge poses a risk to the East Waterway. <br />This Executive Summary should only be used in the context of the full report. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.